§ 153.165 — Backfill over underground utilities
Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 153.165
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/85db6e19-ee06-474b-bbdf-96b901003d2f
§ 153.165. - Backfill over underground utilities.
(a) Where an underground utility is to be placed in an area which has a permanent type street or sidewalk surface, or upon which such a surface is to be constructed within a period of one year, the backfill above the utility or in case of sewers, above the top of the gravel cradle, to the level of the bottom of the permanent type surface shall be made with material specified by "Selected Granular Backfill" as provided for in the latest revised edition of the Standards and Specifications for Water and Sewer Main Construction in Illinois except that bluff sand and boiler slag may not be used for "Selected Granular Backfill". There shall be 12 inches of CA-6 crushed stone or similar material below the top of subgrade in all areas where utility trenches cross the pavement subgrade except in areas which will be lime treated or areas where rock will be used to stabilize the subgrade. Compaction of "selected granular backfill" shall be done by placing in layers not exceeding 12 inches in depth, each layer to be thoroughly tamped to the satisfaction of the city engineer. In instances when the underground utility is placed parallel and within the curblines of the roadway, the city engineer may allow the backfilled trench to be fitted in accordance with the Standard Specifications for Road and Bridge Construction of the Illinois Department of Transportation. (b) In areas not now subject to vehicular traffic, nor in the opinion of the city engineer likely to be within a period of one year, backfill may be made with selected excavation material which is free from clods and stones, provided such trench backfill is adequately jetted from the bottom up completely filling the trench immediately after backfilling.
(Ord. No. 804-10-93, § 1(Exh. A), 10-19-93)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.