For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 172.10.10 — Permits required

Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 172.10.10

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/3d6e0487-d84f-4588-a044-6d80dbd4da62

§ 172.10.10. - Permits required.

(a) No electrical work shall be constructed, installed, repaired, removed, or remodeled in any building in the city or within any other area under its jurisdiction unless an electrical permit for such work has been issued by the department. Upon application and approval of the department, the city shall issue a permit. All work performed pursuant to any permit issued hereunder shall meet the requirements for workmanship, methods, and materials set forth in the provisions of the 2017 National Electrical Code and the Springfield Electrical Ordinance. The permit shall be posted on the premises at the time the work is commenced. Upon completion of the permitted electrical work, the electrical contractor or the owner shall notify the department which shall inspect the work within two working days after the notice is given. When any electrical equipment is to be hidden or concealed from view by the permanent placement of parts of the building, the person shall notify the department and the equipment shall not be concealed until it has been inspected and approved or until two working days shall have elapsed from the time of notification. (b) Exempt work. An electrical permit shall not be required for the following: (1) Portable motors or other portable appliances energized by means of a cord or cable having an attachment plug end to be connected to an approved receptacle when that cord or cable is permitted by this Code. (2) Repair or replacement of fixed motors, transformers or fixed approved appliances of the same type and rating in the same location. (3) Temporary decorative lighting. (4) Repair or replacement of current-carrying parts of any switch, contactor, or control device. (5) Reinstallation of attachment plugs or receptacles, but not the outlets, thereof. (6) Repair or replacement of any overcurrent device of the required capacity in the same location. (7) Repair or replacement of electrodes or transformers of the same size and capacity for signs or gas tube systems. (8) Taping joints. (9) Removal of electrical wiring. (10) Temporary wiring for experimental purposes in suitable experimental laboratories. (11) The wiring for temporary theater, motion picture or television stage sets. (12) Electrical wiring, devices, appliances, apparatus, or equipment operating at less than 25 volts and not capable of supplying more than 50 watts of energy. (13) Low-energy power, control and signal circuits of classes II and III as defined in this Code. (14) Installation, alteration or repair of electrical wiring, apparatus or equipment for the generation, transmission, distribution or metering of electrical energy or in the operation of signals or the transmission of intelligence by a public or private utility in the exercise of this function as a serving utility. (15) Radio apparatus or equipment for wireless reception of sounds and signals. (16) Apparatus, conductors, or other equipment installed for or by municipally owned and operated public utilities and common carriers which are under the jurisdiction of the Illinois Commerce Commission for use in their operation. Exemption from the permit requirements of this Code shall not be deemed to grant authorization for any work to be done in violation of the provisions of this Code or any other laws or ordinances of this jurisdiction. All electrical work, as defined in section 172.12.05 of this Code, is subject to inspection by the department regardless of whether a permit is required. (c) Permit expiration. Every permit issued shall become invalid if the work is not commenced within six months after issuance of the permit, or if the authorized work is suspended or abandoned for a period of six months after the time of commencing work. (d) All permits issued by the department are to be posted by the person receiving the permit, on the premises where the electrical work is to be done, while the work is underway. (e) The department may issue a permit for the construction of a part of an electrical system before all of the documents for the system have been submitted or approved, provided adequate information and detailed statements have been filed complying with all pertinent requirements of this chapter. The holder of the permit may perform the work authorized by the partial permit at his own risk without assurance that the permit for the building, structure, or electrical system will be granted. (f) Except as provided elsewhere of unsafe and dangerous buildings, every permit issued by the department shall expire one year from the date of issuance. The building official shall grant one or more extensions of time for additional periods if there is reasonable cause. (g) Whenever any work requiring a permit is started without a permit, a special inspection shall be made prior to issuance of a permit.

(Ord. No. 826-12-06, § 1(Exh. A), 12-19-06; Ord. No. 409-11-13, § 1(Exh. A), 11-19-13; Ord. No. 056-02-23, § 1(Exh. A), 2-21-23)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.