For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 172.10.12 — Application for electrical permit

Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 172.10.12

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/3175491b-0e9b-43ca-abce-3529af6da036

§ 172.10.12. - Application for electrical permit.

(a) Information required. To obtain a permit, an applicant shall first file an application in writing on a form furnished by the department for that purpose. Every such application shall: (1) Identify and describe work to be covered by the permit for which application is made. (2) Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work. (3) Indicate the use or occupancy for which the proposed work is intended. (4) Be accompanied by plans, diagrams, computations, and specifications and other data as required by subsection (b) of this section. (5) Be signed by permittee, or authorized agent. (6) Give such other data and information as may be required by the building official. (b) Plans and specification. Plans, engineering calculations, diagrams and other data shall be submitted in two sets with each application for a permit. The building official shall require plans, computations and specifications to be prepared, designed, and sealed by a professional engineer or architect licensed by the State of Illinois to practice as such per the current Illinois Professional Engineering and Architectural Practice Act and shall bear an original signature. The submittals do not need to be sealed for interior design projects that do not involve life safety or structural changes. Exceptions: The submittal requirements do not apply to any of the following: (1) The construction, remodeling or repairing of a detached single-family dwelling on a single lot. (2) The construction, remodeling or repairing of a two-family residence of wood frame construction on a single lot, not more than two stories and basement in height. (3) Instances where the building official finds that the nature of the work applied for is such that reviewing of plans is not necessary to obtain compliance with this Code. (c) Information on plans and specification. Plans and specifications shall be drawn to scale upon substantial paper and shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this Code and all relevant laws, ordinances, rules and regulations. Plans for buildings of other than Groups R-3 and R-4 Occupancies shall indicate how required structural and fire-resistive integrity will be maintained where a penetration will be made for electrical and communication conduits, pipes and similar systems. Plans and specifications must contain the following information: (1) Floor plans for each floor of the building; (2) Indicate lighting and power outlets; (3) Power riser diagram indicating service equipment feeders; (4) Location of equipment and branch circuit panels; (5) Grounding and bonding or equipment; (6) Size of service, feeders, conduit, and type of conduit being used; (7) Type of ceiling and if the area above the ceiling is being used as a return air plenum; (8) Communication equipment, fire alarm, emergency lights and type of cable being used; (9) Legend of electrical symbols being used per drawing explaining the meaning of each symbol and line used. Anything that can not be explained by symbols and lines will be clarified with neatly lettered notes or explained in the specifications; (10) Show grounding; (11) Emergency equipment; (12) Transfer switch if any; (13) Emergency panels; (14) Special panels. (d) Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned six months after the date of filing, unless such application has been diligently pursued or a permit shall have been issued; except that the building official shall grant one or more extensions of time for additional periods not exceeding 90 days each if there is reasonable cause. (e) No permit shall be issued by the department of building and zoning for any "development" located within the "floodplain," as those terms are defined in chapter 150 of this Code, unless the provisions of chapter 150 have first been complied with.

(Ord. No. 826-12-06, § 1(Exh. A), 12-19-06; Ord. No. 159-5-14, § 1(Exh. A), 5-6-14)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.