§ 172.10.14. - Inspections, plans and specifications.
(a) General. All electrical systems and equipment for which a permit is required by this Code shall be subject to inspection by the building official or his authorized representative, and the electrical system shall remain accessible and exposed for inspection purposes until approved by the building official or his authorized representative. It shall be the duty of the permit applicant to cause the electrical system to remain accessible and exposed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for the expense entailed in the removal or replacement of any material required to permit inspection. When the installation of an electrical system and equipment is complete, an additional and final inspection shall be made. Electrical systems and equipment regulated by this Code shall not be connected to the energy source until authorized by the building official. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this Code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel provisions of this Code or of other ordinances of the jurisdiction shall not be valid. (b) Inspection requests. It shall be the duty of the person doing the work authorized by a permit to notify the department that such work is ready for inspection. The building official may require that every request for inspection be filed at least two working days before such inspection is desired. Such request may be in writing or by telephone. It shall be the duty of the person requesting inspections required by this Code to provide access to and means for inspection of such work. (c) Operation of electrical equipment. The requirements of this section shall not be construed to prohibit the operation of any electrical system or equipment installed to replace existing equipment. The request for inspection of such equipment must have been filed with the building official not more than 48 hours after such replacement work is completed and before any portion of such electrical system is concealed by any permanent portion of the building. (d) Other inspections. In addition to the called inspections required by this Code, the building official may make or require other inspection of any work to ascertain compliance with the provisions of this Code and other laws which are enforced by the code enforcement agency. (e) Reinspection. When a third inspection of work is required as a result of any of the following situations, a reinspection fee shall be assessed as provided for in this chapter: (1) Failure to provide access on the date for which an inspection has been scheduled. (2) Failure to follow plans requiring the approval of the department. (3) Failure to provide the correct address for an inspection site. (4) Failure to correct violations cited during a previous inspection. (5) Calling for inspection before the work is ready for inspection or reinspection. (6) Failure to provide approved plans on the job site for review by the inspector.
(Ord. No. 826-12-06, § 1(Exh. A), 12-19-06)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.