For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.130.180 — Commercial solar energy generating facilities, community scale

Municipal Code of the City of Evansville, Indiana (legislation through 06-22-2026) · Evansville Municipal Code § 18.130.180

Corpus is an independent public-information project, not the official City of Evansville website. Stable reference: corpuslaw.us/code/a108ad47-75ca-4281-adb4-6699b9119760

§ 18.130.180: Commercial solar energy generating facilities, community scale.

(A) Standards and requirements specific to community-scaled solar (on sites less than 10 acres in size) are established herein to ensure that these facilities fit appropriately into the community with minimal impact on surrounding uses. (B) Rooftop Shared Solar. (1) Rooftop systems are permitted in all districts without a special use; (2) Height. Can exceed the maximum height for the district as long as the solar panels are not taller than 10 feet above the roof line. (C) Ground-Mounted Systems. (1) Setbacks (superseding or in addition to those shown in EMC § 18.130.010, Table A). (a) All solar energy system arrays shall have at least a 20-foot setback from any improved right-of way that abuts the solar energy system site; (b) The setback along any solar system property line that is adjacent to a residential use or district shall be a minimum of 20 feet; (c) No setback shall be less than five feet along any other property line. (2) Screening. Due to the tighter urban spaces that may be typical for community-scaled solar projects, the trees used for the street and property buffers shall have a width of 25 feet or less as shown on the tree lists in the Manual. (3) Ground Cover. (a) The petitioner shall plant, establish and maintain for the life of the project perennial vegetative ground cover on the solar energy system site including the landscaped tree buffer areas. (b) The use of pollinator seed mixes and native or naturalized species for this ground cover is strongly encouraged. (c) Maintenance practices shall control for invasive and noxious species. (4) Decommissioning. (a) Upon filing the site plan for the project, the petitioner shall also submit a written decommissioning and site restoration commitment signed by the owner. This commitment shall acknowledge the owner’s intent to comply with the requirements of this section for discontinuation of the commercial energy generating activity on the site. (b) At least 60 days before discontinuing the commercial energy generating activity on the site, the owner shall provide to the APC a written notice of intent to decommission the project including a proposed date for completion of final decommissioning. (c) All structures, foundations, roads, other surface gravel, concrete or pavement areas, and cables associated with the project shall be removed. (d) The ground surface of the site shall be restored so that it is reasonably similar to its preconstruction condition. (e) The work to remove the project assets of the solar energy system must be completed no later than one year from the proposed date of final decommissioning provided in the notice.

( Ord. G-2022-5 § 2, passed 6-14-2022 )

Ask a question about Evansville law

Corpus searches the Evansville sections it holds and shows the ones that match, with their citations. Free, no sign-in.