For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 90-268 — Primary system standards

Code of Ordinances of the City of Garden City, Kansas (Codified through Ordinance No. 3053-2026, enacted August 4, 2026. (Supp. No. 36, 1-27, Update 1)) · Garden City Code of Ordinances § 90-268

Corpus is an independent public-information project, not the official City of Garden City website. Stable reference: corpuslaw.us/code/ea7c7d60-1031-4335-9b33-be4e60ea021b

Sec. 90-268. - Primary system standards.

(a) Definitions. (1) A "developer" shall mean the last person or business entity who has sole ownership of the subdivision or section thereof for which URD facilities are to be installed under the provisions of this subsection. (2) A "development" is any platted land four or more parcels or lots of real estate. (b) Procedures. To initiate the design and cost estimating process for development, the following procedures will apply: (1) Subdivision development. The developer will schedule a project coordination meeting with the electric utility and submit two copies of the city or county approved final plat and other pertinent maps and drawings as requested. (2) Construction on a lot not served by meter pedestal or secondary junction vault. The builder will schedule a project coordination meeting with the electric utility and submit two copies of the approved site plan, or other drawings as requested. (3) Construction on a lot served by an existing secondary junction vault or metering pedestal. No coordination with electric utility is required. a. All project design and cost estimates will be scheduled by the electric utility based upon the date of submittal of project information and existing workload. b. The customer must provide written easements to the city for all properties which the line extension will cross. The city will furnish the standard form for these easements and will designate width of easements and acceptable line routes. c. All preceding procedures must be satisfied and all required fees paid before the project work order will be scheduled for construction. d. The following site preparation must be completed prior to construction start: i. Lot corners or other requested references must be marked by the customer. This may include locating associated electric easements granted for access to and construction within the project site. ii. Final grade of construction area of route must be established and coordinated with electric utility personnel. iii. Streets or access routes and construction areas must be open for safe equipment passage and operation. iv. PVC conduit crossings of roadways and other physical barriers must be provided by the customer as requested by the electric utility. These installations must meet city specifications. v. Customer-owned facilities must be inspected and approved by the appropriate governing agency prior to final connection to the city-owned facilities and/or system.

(Ord. No. 2207, § 1, 10-8-02)

Ask a question about Garden City law

Corpus searches the Garden City sections it holds and shows the ones that match, with their citations. Free, no sign-in.