Sec. 90-269. - Electric system connection fee.
Anyone who requires connection to the city's electrical distribution system with a disconnect size above 800 amperes in rating shall pay an electrical system connection fee. This electrical system connection fee is intended to be a contribution to the capital cost of providing electrical distribution services. In the case of an expansion of an existing service, the electrical system connection fee shall only be for the amount by which the service size is expanded from the existing service. The amount of the electrical system connection fee shall be adjusted by the city from time to time, taking into account the current cost of material, equipment, labor and overhead expenses. Effective June 1, 2012 the fee is calculated as follows: Electrical System Connection Fee Schedule In the case of multiple services per building, the service entrance size shall be based on total service disconnect sizing. The Electric System Connection Fee is based on the total service disconnect size for all service disconnect sizes above 800 amperes or above in rating. Fees are for each 100 amps of service disconnect rating. Example: Three phase 800 amperes disconnect at 277/480 volts. ($727.00 X 8 = $5,816.00) Voltage | Fee for each 100 amps of service or part thereof Single Phase | 120/240 Volts | $175.00 120/208 Volts | $180.00 Three Phase | 120/240 Volts | $280.00 120/208 Volts | $315.00 277/480 Volts | $727.00 Costs for service voltages other than those shown above will be calculated on a $12.00 per required kVA basis by the city utility department. All electrical system connection fees shall be paid prior to the issuance of a building permit for a project or an electrical permit if no building permit is issued. Electrical system connection fees may not be transferred.
(Ord. No. 2207, § 1, 10-8-02; Ord. No. 2533-2011, § 5, 12-20-11)
Ask a question about Garden City law
Corpus searches the Garden City sections it holds and shows the ones that match, with their citations. Free, no sign-in.