§ 12.06.318 — Permit Requirements
Municipal Code of the City of Shawnee, Kansas (Codified through Ordinance No. 3558, adopted August 10, 2026. (Supp. No. 9, Update 2)) · Shawnee Municipal Code § 12.06.318
Corpus is an independent public-information project, not the official City of Shawnee website. Stable reference: corpuslaw.us/code/d9e88b5d-325c-4f2d-97f6-4b128c309abf
12.06.318 - Permit Requirements.
A. Except as otherwise provided, no ROW-User may Excavate any Right-of-Way or conduct any Repairs, Construction, or reconstruction of facilities located within the Right-of-Way without first having obtained the appropriate Permit. A Right-of-Way Work Permit shall be required for all work within the Right-of-Way. A Right-of-Way Work Permit does not authorize Street Excavations. A separate Street Excavation Permit shall be required and obtained for any Excavation within a Street. B. ROW-Users shall not be required to obtain a Permit when performing Routine Maintenance Operations which do not require Excavation in the Right-of-Way and do not require a lane closure exceeding one (1) hour. C. No ROW-User or Person shall Construct, maintain, or permit in or on the portion of the public Right-of-Way to which such land is adjacent, any fixed structure, material or object without having obtained the appropriate Permit. D. A Permit is required for Emergency situations. If due to an Emergency it is necessary for the ROW-User to immediately perform work in the Right-of-Way, and it is impractical for the ROW-User to first get the appropriate Permit, the work may be performed, and the required Permit shall be obtained as soon as possible during the next City working Day. E. No Permittee may Excavate or work within the Right-of-Way beyond the date or dates specified in the Permit unless the Permittee: 1. Before the expiration of the initial Permit, applies for an extension of the initial Permit, or applies for a new Permit, and 2. A new Permit is obtained or the initial Permit is extended. F. Permits issued shall be conspicuously displayed by the Permittee at all times at the indicated work site and shall be available for inspection by the Director, other City employees and the public. G. Prior to the commencement of Excavation, the Permittee shall exercise due caution to identify and locate any buried facilities. Permittee shall timely comply with all provisions of the Kansas Underground Utility Damage Prevention Act and amendments thereto. The Director may order Permittee to cease, and upon issuance of such an order, Permittee shall cease all work not in compliance with the Kansas Underground Utility Damage Prevention Act. H. Before receiving a Permit, the Applicant must show proof of any necessary Permit, license, certification, grant, registration, franchise agreement or any other authorization required by any appropriate Governmental Entity, including, but not limited to, the City, the FCC or the KCC. I. Any ROW-User who is found to be working in the public Right-of-Way without a Permit will be directed to stop work until a Permit is acquired and properly posted at the work site. The only exception allowed is for Emergency Repair work. J. Any Permittee found to be working without providing for required safety and traffic control will be directed to stop work until the appropriate measures are implemented in accordance with the latest edition of the Federal Highway Administration's Manual on Uniform Traffic Control Devices.
(Ord. 3331, 2020) (Ord. 2805, 2006)
Ask a question about Shawnee law
Corpus searches the Shawnee sections it holds and shows the ones that match, with their citations. Free, no sign-in.
