12.06.320 - Permit Applications.

A. Application for a Permit shall be submitted to the Director either by the ROW-User or by the Person who will do the work and/or Excavation in the Right-of-Way. B. Permit applications for all work in the Right-of-Way, except Small Cell Facilities, shall contain and be considered complete upon receipt of the following: 1. Proof of registration with the Director, as required by this Chapter and, if applicable, proof of a current General Land Disturbance Permit as required by Chapter 11.20 Land Disturbance Activities a of the Shawnee Municipal Code and the Shawnee Design and Construction Manual. 2. Submission of a completed Permit application form, including all required attachments and scaled drawings showing the location and area of the proposed project and the location of all existing and proposed Facilities at such location; 3. A traffic control plan; 4. Payment of all money due to the City for Permit fees and costs, for prior Excavation costs, for any loss, damage or expense suffered by the City because of the Applicant's prior Excavations of the Right-of-Way or for any Emergency actions taken by the City; 5. Certificate of liability insurance; 6. Performance and Maintenance Bond; 7. Any other requirement that the City Engineer deems reasonable to protect the health, safety, and welfare of the traveling public. C. Permit applications for Small Cell Facilities shall contain and be considered complete upon receipt of the following: 1. Compliance with verification of registration; 2. Submission of a completed Permit application form, including all required attachments and scaled drawings showing the location and area of the proposed project, the location of all existing and proposed Facilities at such location, and the location of other small cell facilities within one thousand (1,000) feet owned by the Applicant; 3. A traffic control plan to be used during construction, as well as during any future access should the Applicant need to perform maintenance or other work on the Facility; 4. Payment of all money due to the City for Permit fees and costs, for prior Excavation costs, for any loss, damage or expense suffered by the City because of the Applicant's prior Excavations of the Right-of-Way or for any Emergency actions taken by the City; 5. Completion of structural analysis and submission of said analysis with the application. This analysis shall be stamped by a Kansas registered professional engineer and shall show that the Facility is capable of supporting the additional load presented by Small Cell Facilities attached to the pole. It shall also show that the pole is capable of withstanding standard wind loads for applications of this type; 6. An inspection schedule that the Applicant will adhere to throughout the life of the Small Cell Facilities. This schedule shall show that the pole will be inspected for structural defects, at minimum, on an annual basis; 7. Completion and submission of a property owner notification form for every property owner who is adjacent to the proposed installation of the Small Cell Facilities; 8. Any other requirement that the City Engineer deems reasonable to protect the health, safety, and welfare of the public. D. All applications shall be processed within the timeframes required by state and federal law. E. If an Applicant has submitted an application for a permit for the installation, construction, maintenance, or repair of multiple Facilities, that Applicant may not submit another application for a permit for the installation, construction, maintenance, or repair of multiple Facilities until the first application has been approved or denied. The Director may waive this provision. F. Completed Application; Determination; Tolling. 1. The City shall, within thirty (30) calendar days of receipt of an application for Small Cell Facilities, review the application for completeness. An application is complete if it includes the applicable permit review fee(s) and contains all of the applicable submittal requirements set forth in SMC 12.06.320 paragraph C, unless waived by the City. The determination of completeness shall not preclude the City from requesting additional information or studies either at the time of the determination of completeness or subsequently if new or additional information is required, or substantial changes in the proposed action occur, or the proposed Small Cell Facilities installation or modification is modified by the Applicant, as determined by the City. 2. The City shall notify the applicant within thirty (30) calendar days of receipt of the application that the application is incomplete. Such notice shall clearly and specifically delineate all missing documents or information. 3. The application review period begins to run when the application is submitted, and may be tolled when the City determines that the application is incomplete and provides notice as set forth below. The application review period may also be tolled by mutual agreement of the City and the Applicant. The timeframe for review is not tolled by a moratorium on the review of eligible Facility installation or modification applications. a. To toll the timeframe for review for incompleteness, the City shall provide written notice to the Applicant within thirty (30) calendar days of the date of receipt of the application, clearly and specifically delineating all missing documents or information. Such delineated information is limited to submittals set forth in SMC 12.06.320 paragraph C and any supplemental information requested by the City that is reasonably related to determining whether the proposed Facilities installation or modification will substantially change the physical dimension of an eligible support structure. b. The timeframe for review begins running again when the City is in receipt of Applicant's supplemental submission in response to the City's notice of incompleteness. c. Following a supplemental submission, the City shall have ten (10) calendar days to notify the Applicant that the supplemental submission did not provide the information identified in the original notice delineating missing information. The timeframe is tolled in the case of second or subsequent notices pursuant to the procedures identified in SMC 12.06.320F.3.d. Except as may be otherwise agreed to by the Applicant and the City, second or subsequent notices of incompleteness may not specify missing documents or information that was not delineated in the original notice of incompleteness. d. A notice of incompleteness from the City will be deemed received by the Applicant upon the earlier of, personal service upon the authorized person, delivery by electronic mail to the authorized person (if such delivery is authorized for receipt of notice by the authorized person), or three (3) business days from deposit of the notice in the United States Mail, postage prepaid, and in an envelope properly addressed to the authorized person using the address set forth in the application. G. In the event that after submittal of the application, or as a result of any subsequent submittals, Applicant modifies the proposed Facilities installation or modification description in the initial application, the application as modified will be considered a new application subject to commencement of a new application review period; provided that, Applicant and the City may, in the alternative, enter into a mutually agreeable tolling agreement allowing the City to request additional submittals and additional time that may be reasonably necessary for review of the modified application. H. Small Cell Facilities applications shall not be considered submitted until an agreement is in place between the Applicant and the City for use of the public Right-of-Way.

(Ord. 3396, 2021) (Ord. 3331, 2020) (Ord. 3167, 2016) (Ord. 2805, 2006)