For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.06.344 — Work Requirements and Inspections

Municipal Code of the City of Shawnee, Kansas (Codified through Ordinance No. 3558, adopted August 10, 2026. (Supp. No. 9, Update 2)) · Shawnee Municipal Code § 12.06.344

Corpus is an independent public-information project, not the official City of Shawnee website. Stable reference: corpuslaw.us/code/2a7987f9-9d15-4c28-9f8b-220b0245c62d

12.06.344 - Work Requirements and Inspections.

A. Any Excavation, back filling, Repair and Restoration, and all other work performed in the Right-of-Way shall be done in conformance with the latest Shawnee Design and Construction Manual. B. The Permittee shall employ a testing laboratory as approved by the Director, which shall certify the proper back-filling on any Street cut. The Permittee may pay all costs associated with such testing. This provision shall be waived with the advanced written permission of the Director. C. Upon completion of the work and Restoration authorized by the Permit, a Permit shall be subject to a written final inspection by the Director. It shall be unlawful for any Permittee to fail to obtain a satisfactory final inspection report prior to the expiration of the Permit. D. The Permittee shall notify the Director to schedule an inspection at the start of back filling. Required inspections are listed in the latest Shawnee Design and Construction Manual. E. When any corrective actions required have been completed and inspected to the Director's satisfaction, the two-year maintenance period will begin. F. In addition to the required scheduled inspections, the Director may choose to inspect the ongoing permitted work in the Right-of-Way at any time to ensure that all requirements of the approved Permit are being met by the Permittee. G. At the time of any inspection, the Director may order the immediate cessation of any work, which poses a serious threat to the life, health, safety, or well-being of the public. The Director may issue a citation to the Permittee for any work, which does not conform, to the applicable standards, conditions, code or terms of the Permit. The citation shall state that failure to correct the violation will be cause for revocation of the Permit.

(Ord. 3396, 2021) (Ord. 2805, 2006)

Ask a question about Shawnee law

Corpus searches the Shawnee sections it holds and shows the ones that match, with their citations. Free, no sign-in.