§ 18-36.2 — Alternate materials and alternate methods of construction
Code of Ordinances of the City of Bossier City, Louisiana (Codified through Ordinance No. 182-2025, adopted December 2, 2025 (Supp. No. 23)) · Bossier City Code of Ordinances § 18-36.2
Corpus is an independent public-information project, not the official City of Bossier City website. Stable reference: corpuslaw.us/code/11b0bb20-2f0b-44a8-a025-f2424774000f
Sec. 18-36.2. - Alternate materials and alternate methods of construction.
The provisions of this Code are not intended to prevent the use of any material, or method of construction not specifically prescribed by this Code, provided any such alternate has been approved and its use authorized by the building inspector. The building inspector shall approve any such alternate, provided he finds that the proposed design is satisfactory and complies with the provisions of chapter 12, and that the materials, method, or work offered is, for the purpose intended, at least the equivalent of the prescribed in the Code in quality, strength, effectiveness, fire-resistance, durability, and safety. The building inspector shall require that sufficient evidence or proof be submitted to substantiate any claim that may be made regarding its use. If, in the opinion of the building inspector, the evidence and proof are not sufficient to justify approval, the applicant may refer the entire matter to the building code board of appeals as stipulated in Section 111.
(Ord. No. 64-2007, 7-24-2007; Ord. No. 132-2019, 11-5-2019)
Ask a question about Bossier City law
Corpus searches the Bossier City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
