§ 18-39 — Permits
Code of Ordinances of the City of Bossier City, Louisiana (Codified through Ordinance No. 182-2025, adopted December 2, 2025 (Supp. No. 23)) · Bossier City Code of Ordinances § 18-39
Corpus is an independent public-information project, not the official City of Bossier City website. Stable reference: corpuslaw.us/code/81933f48-1595-4ab6-ad86-30ce0ff7c5e8
Sec. 18-39. - Permits.
(1) Action on application. (a) A person, firm or corporation shall not erect, construct, enlarge, alter, repair, move, improve, remove, convert or demolish any building or structure in the applicable jurisdiction, or cause the same to be done, without first obtaining a separate building permit for such building or structure for the building official. (b) If the building official is satisfied that the work described in an application for permit and the drawings filed therewith conform to the requirements of this Code and other pertinent laws and ordinances, he shall issue a permit therefor to the applicant. (c) If the application for a permit and the drawings filed therewith describe work which does not conform to the requirements of this Code or other pertinent laws or ordinances, the building official shall not issue a permit but shall return the drawings to the applicant with his refusal to issue such permit. Such refusal shall, when requested, be in writing and shall contain the reasons therefor. (d) Building permits issued for the repair, reconstructions and rehabilitation of placarded substandard buildings or structures shall comply with the provisions set forth by the current codes adopted by the Louisiana State Uniform Construction Code Council. A bond equal to one-third of the cost of construction or a cash bond (certified check) of one-third of the cost of construction shall be posted with the permit application to be used as penalty fee in order to ensure compliance with the herein referenced codes. Failure to comply shall result in forfeiture of the bond in favor of the city and immediate commencement of condemnation hearings. Compliance shall result in the return of the bond to the applicant and allowance of occupancy. (2) Contractors license and bond required. Any person, firm or corporation, including subcontractors or specialty contractors, who for a fixed price, fee or wage shall undertake, direct or assume charge of any building construction, alteration, addition, repair, moving or demolition when the cost exceeds $10,000.00 shall first file, and annually renew, a minimum $100,000.00 indemnity bond or certificate of public liability and property damage insurance in a like amount. (3) Condition of the permit. (a) The regular permit fee shall be doubled when any work is begun prior to securing a permit except as provided for in Section 106.6. (b) No permit of any kind shall be issued for any other related work involving new construction, additions or relocated buildings or structures until the building permit shall have first been issued. (c) The building official shall act upon an application for a permit with plans as filed, or as amended, without unreasonable or unnecessary delay. A permit issued shall be construed to be a license to proceed with the work and shall not be construed as authority to violate, cancel, alter or set aside any of the provisions of this Code, nor shall such issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans as in construction or of violation of this Code. Any permit issued shall become invalid unless work authorized by it shall have been commenced within six months after it issuance, or if the work authorized by such permit is suspended or abandoned for a period of one year after the time the work is commenced, provided that for cause, one or more extensions of the time for periods not exceeding 90 days each, may be allowed in writing by the building official. (4) Drawings to be kept at site. When the building official issues a permit, he shall endorse, in writing or stamp, both sets of plans "Reviewed for Code Compliance." One set of drawings so reviewed shall be retained by the building official and the other set shall be returned to the applicant. The permitted drawings shall be kept at the site of work and shall be open to inspection by the building official or his authorized representative. (5) Permits issued upon affidavits. Whenever a permit is to be issued in reliance upon an affidavit as provided in Section 105.6 or whenever the work to be covered by a permit involves construction under conditions which, in the opinion of the building official, are hazardous or complex, the building official shall require that the architect or engineer who signed the affidavit or made the drawings or computations shall supervise such work, be responsible for its conformity with the permitted drawings and forthwith upon its completion make an file with the building official, written affidavit that the work has been done in conformity with the approved plans and with the structural provisions of the Code. In the event such architect or engineer is not available, the owner shall employ in this stead a competent person or agency whose qualifications are approved by the building official. (6) Foundation permits. When application for permit to erect or enlarge a building has been filed and pending issuance of such permit, the building official may, at his discretion, issue a special permit for the foundations of such building. The holder of such a special permit shall proceed at his own risk and without assurance that a permit for the superstructure will be granted.
(Ord. No. 64-2007, 7-24-2007; Ord. No. 132-2019, 11-5-2019)
Ask a question about Bossier City law
Corpus searches the Bossier City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
