For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-40 — Fees

Code of Ordinances of the City of Bossier City, Louisiana (Codified through Ordinance No. 182-2025, adopted December 2, 2025 (Supp. No. 23)) · Bossier City Code of Ordinances § 18-40

Corpus is an independent public-information project, not the official City of Bossier City website. Stable reference: corpuslaw.us/code/a4da43ef-c85f-4b2b-9280-48a5d8f11356

Sec. 18-40. - Fees.

(a) General. No permit shall be issued until the fees prescribed in this section shall have been paid. Nor shall an amendment to a permit be approved until the additional fee, if any, due to an increase in the estimated cost of the building or structure shall have been paid. (b) Failure to obtain a permit. If any person commences any work on a building or structure before obtaining the necessary permit from the city, he shall be subject to the penalty prescribed herein. On all work started without first obtaining a permit, the fees shall be doubled plus a $500.00 penalty, but the paying of such double fees and penalty shall not relieve any person from fully complying with the requirements of this Code in the execution of the work. (c) Accurate records. The building official shall keep a permanent and accurate accounting of all permit fees and other monies collected, the names of all persons paying such fees, the permitted location, type of construction, the date and amount thereof. (d) Schedule of permit fees. (1) Permit fees. a. Commercial building permit fees shall be based upon the actual contract price of all new construction, additions, repairs and alterations. b. Residential building permit fees shall be based upon actual contract price of all additions, repairs, and alterations. c. New residential building permit fees shall have a set base fee and a cost per square foot under roof and including all habitable square footage on additional floors. d. When a building or structure is constructed by the owner and no contract price is involved, the building permit fee shall be based on the valuation of average current building cost per square foot for the type of construction. e. It shall be the duty and responsibility of the building official and the building inspector to establish and maintain a cost formula to determine the actual current cost of all construction work. f. Industry notice of any revision of the cost formula shall be considered as having been given when such revision has been delivered or mailed to the local offices of the Associated General Contractors (A.G.C.) and the Home Builders Association (H.B.A.) with office copies available for public use. g. On all buildings, structures or alterations requiring a building permit as set forth in Section 105, the fee shall be paid as required at the time of issuance of the permit in accordance with the schedule set forth in Subsections 107.4-2 through 107.5. (2) Fees for building permits. a. A minimum permit fee of $50.00 shall be charged for any work governed by the requirements of this Code when the construction cost is less than $2,000.00. b. For all such work costing in excess of the $2,000.00, the fee shall be $5.00 per $1,000.00 or fraction thereof of the cost of construction. c. Demolition. The permit fee for the demolition of any building or structure shall be $50.00 when such demolition cost is less than $2,000.00; for all such work costing in excess of $2,000.00 the fee shall be $5.00 per $1,000.00 or the fraction thereof of the demolition cost. d. New residential homes permit fees shall be $350.00 plus $.15 per square foot under roof to include all habitable rooms on additional floors. e. Moving building. The permit fee for moving a building or structure across or along any street or streets, alley or alleys shall be: for a one-story building, $50.00, for a 1½ story or two-story building, $50.00, for all other buildings over two stories, $50.00. f. Before moving any building, the permit shall be presented to the Bossier City Police Department for approval of the route for travel and arrangements for a travel escort as required by law. (3) Fees for signs and billboards. a. Building permits for signs and billboards to be constructed, erected, installed, structurally altered, changed or relocated will not be issued before first securing an electrical permit. b. All new signs shall comply with the structural requirements of Section 3108 of this Code and with the provisions of chapter 90 of the Code of Ordinances, City of Bossier City, Louisiana. c. No City of Bossier City building permit shall be issued for a billboard sign on any state or federal designated highway within the corporate limits without evidence of a permit having first been issued by the state department of transportation and development. d. The minimum sign permit fee shall be $50.00 or $0.15 per square foot per face side of a sign. (4) Fences and miscellaneous fees. The permit fee for any of the following items of work shall be: a. As provided in Section 107.4-2(a), the minimum fee for any permit shall be $50.00. b. For fences, or masonry walls; painting; sand blasting; steam or chemical cleaning; fixed or movable marquees and awnings; installation of machinery or mechanical equipment, costing in excess of $2,000.00, the fee shall be $5.00 per $1,000.00 or fraction thereof. c. Mobile home, portable or prefabricated building. The permit fee for the setup and location of a mobile home, portable or prefabricated building shall be $50.00. (5) Fence and wall requirements. a. In all residential and business districts, no fence or wall shall be erected to exceed the height of four feet in the required front yard areas, which constitutes the area from the front of the structure to the front of the property line, without first obtaining a variance from the Bossier City-Parish Metropolitan Board of Appeals. Rear and side fences or walls from front line of the structure to read of property line shall not exceed seven feet in height. No fence or wall shall be erected or constructed along a side street property line exceeding four feet in height and that part of the rear property line from the side street line to a point in line with the required setback of the structure. b. On a corner building site in any district in which a front yard is required, no fence wall, hedge or other structure or planting more than three feet in height shall be erected, placed, or maintained within the triangular area formed by the intersecting street lines and straight line connecting such street lines at points 30 feet from the point of intersection measured along such street lines. c. No fence, wall, sign, or other structure, hedge or planting shall obstruct the view of traffic from any street, alley, or driveway. d. Electrical fences may be approved in areas zoned for industrial uses. Electrical fences are prohibited in any form in any other areas of the City of Bossier City, including any wires or devices attached to or on top of any fence, wall or structure that may produce an electrical shock. e. Barbwire for fences shall be used only high than six feet above ground. f. Building permits shall be required for all masonry fences or walls and all types of fences in residential, commercial and industrial areas. (6) Building permit valuations.

(Ord. No. 64-2007, 7-24-2007; Ord. No. 17-2018, 3-6-2018; Ord. No. 132-2019, 11-5-2019)

Ask a question about Bossier City law

Corpus searches the Bossier City sections it holds and shows the ones that match, with their citations. Free, no sign-in.