§ 6-482 — Definitions
Code of Ordinances of the City of Lake Charles, Louisiana (Codified through Ordinance No. 20598, enacted August 5, 2026. (Supp. No. 21, Update 1)) · Lake Charles Code of Ordinances § 6-482
Corpus is an independent public-information project, not the official City of Lake Charles website. Stable reference: corpuslaw.us/code/538e6784-581b-43f5-abf5-ce19f49cd586
Sec. 6-482. - Definitions.
The following terms, when used in this article, shall have the following meanings, unless the context clearly indicates otherwise: (a) Baseline flood elevation (BFE). A minimum construction elevation dictated by FEMA floodplain requirements. (b) Drainage impact analysis shall refer to a submission made to the city to addresses all drainage requirements in article X. (c) Commercial development. The term commercial development includes businesses, retail establishments, multi-family dwellings(3 or more units on a single tract of land), and developments with mixed residential commercial uses. Commercial developments do not include existing or new residential lots or subdivisions. (d) Commercial development—Existing. A commercial development in existence, or in the approval process as of January 1, 2021. Existing commercial development shall also apply commercial developments that area annexed into the city and either: (1) Were in existence as of January 1, 2021; or (2) Were approved by the parish under their drainage ordinance. (e) Commercial development—Expanded. An increase in impervious surface area to an existing commercial development. (f) Commercial development—New. Commercial developments that are proposed or constructed after January 1, 2021. (g) Commercial developments—Large. Any new or expanded commercial development that is located on a tract of greater than two acres. (h) Commercial development—Small. Any new or expanded commercial development that is located on a tract of less than or equal to two acres. (i) Fill mitigation. A requirement for properties within designated flood zones A, AE, and VE to have a net zero impact on flood plain stormwater storage volume. (j) Freeboard elevation. Minimum construction height standards to protect structures from flooding as specified in section 6-487. (k) FEMA. Federal Emergency Management Agency, responsible for development of BFEs. (l) Impervious surface areas. Areas constructed of concrete, asphalt, or other solid materials that prevent flow of stormwater to the ground surface. (m) Increase in impervious area. The "net" increase in impervious surface area. This term may apply where redevelopment of existing parcels occur. If a 10,000 square foot impervious surface area is removed and replaced with a 25,000 square foot impervious area, the increase in impervious area equals 15,000 square feet. When defining a development's impervious area for application of these rules, the "increase in impervious area" is used. (n) Increase in impervious area—De minimis. De minimus increases are defined as increases less than ten per cent of the total impervious surface of the development, not to exceed 5,000 square feet. (o) Rational Method, Modified Rational Method. Runoff hydrologic calculation method designed for watersheds of less than 200 acres. This methodology is included in most hydrology textbooks and provides a peak runoff rate for a catchment area and is typically used in culvert and infrastructure sizing. The Rational Method which is used to calculate peak runoff is distinguished from the Modified Rational Method which is used to calculate required detention storage volume. (p) Residential developments. Developments consisting of platted lots/parcels/plots designated for single-family residential dwellings consisting of no more than two units per dwelling, i.e., a duplex. (q) Residential subdivisions—Existing. Existing platted lots in residential subdivisions approved, or in the approval process, as of January 1, 2021 and/or in established neighborhoods in the city. "Existing residential subdivisions" also applies to subdivisions or platted lots that are annexed into the city and either: (1) Were in existence as of January 1, 2021; or (2) Were approved by the parish under their drainage ordinance. (r) Residential subdivision—New. A subdivision of property into two or more residential lots/parcels/plots after January 1, 2021. (s) Residential subdivisions—Large. Any new or expanded residential development constructed on more than three acres of property. (t) Residential subdivision—Small. Any new or expanded residential development constructed on no more than three acres of property. (u) SCS or NRCS Method. Runoff hydrologic calculation method that is required for watersheds that exceed 200 acres and is used to provide the peak runoff rate and required detention volume. (v) Stormwater runoff management is a requirement for ensuring that, under defined conditions, post-development stormwater flow rates do not exceed pre-development stormwater flow rates. (w) Waterfront Area. The areas bordering the Calcasieu River basin where stormwater discharges directly into the basin and a stormwater strategy of draining quickly, rather than detention, is preferred. The Waterfront Area is defined as being those properties west and north of a line beginning at the intersection of Tank Farm Road and Big Lake Road, then north on Big Lake Road to Country Club Road, then east on Country Club Road to West Prien Lake Road, then north and east on West Prien Lake Road to I-210, then east on I-210 to Lake Street, then north on Lake Street to Dr. Michael DeBakey Drive, then east on Dr. Michael DeBakey Drive to Ryan Street, then north on Ryan Street to Jackson Street, then east on Jackson Street to Enterprise Boulevard, then north on Enterprise Boulevard and 1st Avenue to their dead end, then north on the Calcasieu River levee to Fitzenreiter Road, then east on Fitzenreiter Road to the English Bayou. It should be noted that the Waterfront Area includes all of the Downtown and Lakefront District, as outlined in the city zoning ordinance. A new residential or commercial development located in a Waterfront Area is subject to only those requirements shown in section 6-483 if the stormwater from the development is found to either drain directly to the receiving water stream segments outlined above, or if it can be demonstrated that existing or updated city drainage infrastructure is adequate for the increased stormwater flow. When proposing to use existing or improved infrastructure, the developer will be required to submit calculations demonstrating peak flows from site using one or [more] of the approved runoff calculation methodologies.
(Ord. No. 18753, § 1, 8-19-20; Ord. No. 18813, § 1, 1-6-21)
Ask a question about Lake Charles law
Corpus searches the Lake Charles sections it holds and shows the ones that match, with their citations. Free, no sign-in.
