§ 6-484 — General drainage requirements
Code of Ordinances of the City of Lake Charles, Louisiana (Codified through Ordinance No. 20598, enacted August 5, 2026. (Supp. No. 21, Update 1)) · Lake Charles Code of Ordinances § 6-484
Corpus is an independent public-information project, not the official City of Lake Charles website. Stable reference: corpuslaw.us/code/6a04dde6-9e19-4235-8bf4-c42ae85878f3
Sec. 6-484. - General drainage requirements.
(a) Floodways. New developments shall be designed to avoid impacting any existing floodways. Development in a floodway will require a no-rise certification that is completed in accordance with FEMA guidelines. (b) Stormwater flow from a development. Stormwater flow directions shall be indicated on plans submitted for approval. Stormwater shall be directed to drainage laterals or to the street drainage systems fronting the parcel or to detention facilities as required. (c) Building permits for large and small developments. Any proposed large or small development shall be approved by the city planning director or their designee and shall demonstrate compliance with the provisions of this article prior to the issuance of a building permit. In the event of noncompliance with the provisions of this article, a building permit shall not be issued. (d) Costs borne by developer/owner. All on-site drainage facilities shall be constructed, installed and maintained at the cost of the developer, owner, or property owners. (e) Natural stormwater flow. When during construction, there is an obstruction or impediment of stormwater from or to the adjacent property, then a temporary drainage system shall be constructed to maintain adequate drainage. Such systems shall be permanent, if necessary, to prevent impedance of natural stormwater flow. (f) Stormwater management. Stormwater management is necessary to prevent new residential and commercial developments from impacting neighboring properties. (1) Intent. The intent of these requirements is to minimize the adverse impact of elevated construction/development sites on surrounding developed or undeveloped tracts. The standards below represent minimum requirements and should be modified, if needed, to meet this intent. (2) Stormwater management standards. a. All stormwater for all development types shall be routed from the site to the front property line or to onsite or offsite drainage features that drain away from adjoining properties. See stormwater flow diagrams below. b. Slope along the property lines of any development or construction site shall not exceed three inches of rise for every 12 inches of run. Total fill may not exceed 18 inches in height. c. Where fill exceeds 18 inches in height (for example, to meet FEMA elevation requirements), the developer or owner shall present plans to the city demonstrating minimal impacts to adjoining properties. d. All grading permits are subject to these requirements. e. Flower beds, landscaping features, decks, and such shall not be placed where stormwater flow is impeded. (3) Stormwater management plan submissions. a. Stormwater plans for commercial developments may be included as part of the original site plan submission. b. For all new or re-platted residential subdivisions, the subdivision plat shall include instructions for grading of individual lots as exhibited in the stormwater flow diagrams below. (4) Stormwater flow diagrams. The following flow diagrams represent desired stormwater management for new residential and commercial developments. Flow arrows may be directed to other drainage features as outlined in (f)(2)a. [image omitted; see the official code] (g) Conflicts with DOTD requirements. (1) For developments that require DOTD review, the DOTD provisions related to stormwater control shall apply. (2) All submissions to DOTD shall be submitted concurrently to the city for review. (3) Developments subject to DOTD oversight are not exempt from city zoning requirements that establish setbacks, buffers, landscaping, etc. (h) Offsite issues. In the event that the planning director/city engineer (or their designee) determines that the on-site or the off-site drainage facilities are inadequate to accommodate the additional development runoff, approval of the development shall be withheld until plans and specifications meeting these requirements have been met. All on-site drainage improvements shall be in accordance with approved plans and specifications. All improvements necessary shall be made at the expense of the developer, unless the improvement is of benefit to the city. In this case, the city may consider an agreement to share the costs. (i) Water front areas. Developments in these areas may be required to upsize the drainage piping or system to ensure proper drainage.
(Ord. No. 18753, § 1, 8-19-20; Ord. No. 19107, § 1, 1-19-22)
Ask a question about Lake Charles law
Corpus searches the Lake Charles sections it holds and shows the ones that match, with their citations. Free, no sign-in.