§ 6-486 — Fill mitigation (flood plain storage)
Code of Ordinances of the City of Lake Charles, Louisiana (Codified through Ordinance No. 20598, enacted August 5, 2026. (Supp. No. 21, Update 1)) · Lake Charles Code of Ordinances § 6-486
Corpus is an independent public-information project, not the official City of Lake Charles website. Stable reference: corpuslaw.us/code/50387567-e726-4571-9846-1b0946ec2890
Sec. 6-486. - Fill mitigation (flood plain storage).
(a) Purpose. Fill mitigation (flood plain storage) is intended to ensure that developments do not cause or result in a barrier that will adversely affect the efficiency of, or restrict the flow or capacity of, a designated floodway or watercourse so as to cause foreseeable damage to others, wherever located. For example, should fill material be required, an equal quantity of fill material shall be removed from the construction site, to ensure no loss of flood plain storage volume. (b) Applicability. These requirements apply in designated flood ways or in flood hazard areas A, AE, and VE. The flood plain manager or the city engineer may extend the requirements to other specific areas within the city when observed levels of inundation exceed those of FEMA's base flood elevations. (c) Exemptions. These requirements do not apply to: (1) New residential subdivisions consisting of three or less lots. (2) Construction of single-family residences or duplexes on lots in the city, or those annexed lots in parish, that were platted prior to January 1, 2021. (3) Developments in waterfront areas. Such developments shall not impact low-lying floodwater conveyance areas. (d) Waivers. (1) The city engineer or designee may issue a waiver for either partial or full-fill mitigation requirements based on one of the following: a. The residential subdivision contains three acres or less. b. Minimal fill utilized for filling of depressions or re-grading the site to promote positive drainage shall not be required to be measured for fill mitigation purposes if it does not exceed six inches above the prevailing natural ground. c. Ten per cent of total calculated fill volume calculated in preparation of the overall fill mitigation plans may be exempted from the total required mitigation volume to account for variations in ground conditions. d. A redevelopment of an existing parcel which decreases the impervious area by a minimum of 20 per cent. e. On a case by case basis, due to a developer's inability to generate fill credits, a waiver may be issued for fill mitigation requirements based on the developer providing adequate information that credits are not obtainable and/or alternate design construction techniques cannot be utilized. (2) Waivers must be submitted as per section 6-488. (e) Submittal requirements. (Information for fill mitigation shall be incorporated into the required site grading plan for review and approval.) NOTE: There are no submittal requirements where no fill mitigation is required. (1) Post development fill volume to be deposited below the designated 100-year flood elevation. (2) A fill mitigation plan shall be submitted by a certified licensed Louisiana engineer and is subject to review and approval or denial by the floodplain administrator, the city engineer or designee. Small developments may also utilize licensed contractors, architects, surveyors, or others who can demonstrate that mitigation data is accurate and complies with the intent of this section. In all cases, it shall be demonstrated that fill volume brought onto the site is offset by onsite excavations or offsite excavations within the same watershed. (3) Location of any proposed offsite excavation within the watershed. (4) The fill mitigation plan must be submitted concurrently with, or as part of, the stormwater runoff management plan. (f) Additional requirements. (1) For multi-phase large development projects, fill mitigation can occur either during phase 1 work, or as each phase is completed. (2) Where detention ponds are to be excavated, the volume of dirt removed below the normal pool water surface level of the required minimum pond size cannot be credited as compensating fill mitigation volume. (g) Examples of mitigation efforts to restore flood plain volume, where deposit of fill materials in flood zones is not possible. (1) Expansion of required detention basin. (2) Installation of swales. a. For more information on fill mitigation and offsetting increases in flood plain volumes, see the city website under "Government," then "Public Works," then under "In This Department" tab, click "Drainage"; or in the city planning/engineering departments. (h) Open foundation building techniques. (1) Avoid fill mitigation by adhering to FEMA's design standards for open foundation design or standards contained within ASCE24-05 construction technique for open foundations (walls, piers, posts, columns, or pilings). (2) If open foundation building foundations are used, a fill volume of up to six inches is allowed, and the volume of the walls, piers, posts, columns, or piling volumes shall not be considered. (i) For more information on fill mitigation and offsetting increases in flood plain volumes, see the city website under "Public Works," then "Engineer" or in the City Planning/Engineering departments.
(Ord. No. 18753, § 1, 8-19-20; Ord. No. 18813, § 2, 1-6-21; Ord. No. 18997, § 1, 10-20-21)
Ask a question about Lake Charles law
Corpus searches the Lake Charles sections it holds and shows the ones that match, with their citations. Free, no sign-in.