Sec. 23-85. - Permit application requirements.

All users required to obtain a sewer connection permit shall complete and file with the municipality in which they are located an application in the form prescribed by the municipality and the commissioner, and accompanied by the appropriate fee as prescribed by the municipality. In addition, an industrial user shall complete and file with the commissioner an application for an industrial discharge permit in the form prescribed by the commissioner, and accompanied by the appropriate fee as indicated on the fee schedule set forth in Division 2 herein or annexed hereto as Schedule B. In support of the application for an industrial discharge permit, the industrial user shall submit, in units and terms appropriate for evaluation, the following information: (1) Identifying information. The industrial user shall submit the name and address of the facility, including the name of the operator and owners; (2) Permits. The industrial user shall submit a list of any environmental control permits held by or for the facility; (3) Description of operations. The industrial user shall submit a brief description of the nature, average rate of production and standard industrial classification of the operation(s) carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the facility from the regulated processes. (4) Row measurement. The industrial user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the facility from each of the following: a. Regulated process streams; and b. Other streams as necessary to allow use of the combined waste stream formula of 40 C.F.R. section 403.6(e). The commissioner may allow for verifiable estimates of these flows where justified by cost or feasibility considered. (5) Measurement of pollutants. a. The industrial user shall identify the pretreatment standards applicable to each regulated process; b. In addition, the industrial user shall submit the results of sampling and analysis identifying the nature and concentration (or mass, where required by the standard or facility) of regulated pollutants in the discharge from each regulated process. Both daily maximum and average concentration (or mass, where required) will be reported. The sample will be representative of daily operations; c. A minimum of four (4) grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organics. For all other pollutants, twenty-four-hour composite samples must be obtained through flow-proportional composite sampling techniques where feasible. The facility may waive flow-proportional composite sampling for any industrial user that demonstrates that flow-proportional sampling is infeasible. In such cases, samples may be obtained through time-proportional composite sampling techniques or through a minimum of four (4) grab samples where the industrial user demonstrates that this will provide a representative sample of the effluent being discharged. d. The industrial user shall take a minimum of one (1) representative sample to compile that data necessary to comply with the requirements of this paragraph. e. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the industrial user should measure the flows and concentrations necessary to allow use of the combined wastestream formula of 40 C.F.R. section 403.6(e) in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 C.F.R. section 403.6(e) this adjusted limit along with supporting data will be submitted to the facility; f. Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 C.F.R. Part 136 and amendments thereto. Where 40 C.F.R. Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis will be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the facility or other parties, approved by the EPA; g. The commissioner may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures; h. The baseline report shall indicate the time, date and place of sampling, and methods of analysis, and will certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the facility; (6) Certification. All wastewater discharge permit applications and user reports must be signed by an authorized representative of the user, someone who has general management authority and responsibilities and has the authority to make capital investment decisions, and of initiating and directing other comprehensive measures to assure long term environmental compliance, and contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." A discharge permit applications shall also include a statement, reviewed by an authorized representative of the industrial user and certified to by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and if not, whether additional operation and maintenance ("O and M") and/or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements; and (7) Compliance schedule. If additional pretreatment and/or O and M will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and/or O and M. The completion date in this schedule will not be later than the compliance date established for the applicable pretreatment standard. a. Where the industrial user's categorical pretreatment standard has been modified by a removal allowance (40 C.F.R. section 403.7) the combined wastestream formula (40 C.F.R. section 403.6(e)), and/or a fundamentally different factors variance (40 C.F.R section 403.13) at the time the industrial user submits the report required by section 23-91(a) of this article, the information required by paragraphs (6) and (7) of this section will pertain to the modified limits. b. If the categorical pretreatment standard is modified by a removal allowance (40 C.F.R. section 403.7) the combined waste stream formula (40 C.F.R. section 403.6(e)), and/or a fundamentally different factors variance (40 C.F.R. section 403.13) after the industrial user submits the report required by section 23-91(a) of this article, any necessary amendments to the information required by paragraphs (6) and (7) of this section will be submitted by the industrial user to the facility within sixty (60) days after the modified limit is approved. (8) Other information. Any other information as may be deemed by the commissioner to be necessary to evaluate the permit application. The commissioner will evaluate the data furnished by the industrial user and may require additional information. After evaluation and acceptance of the data furnished, the commissioner may issue an industrial discharge permit subject to terms and conditions provided herein.

(Ord. No. D395, 10-18-96; Ord. No. K35, 11-25-19)