Sec. 23-83. - Sewer connection permits.
All users proposing to connect to or discharge into the facility shall obtain a sewer connection permit from the municipality in which such user is located before connecting to or discharging into the facility. An application for said sewer connection permit shall be filed with the municipality at least five (5) business days prior to the proposed connection or discharge to the facility. Existing users connected to the facility as of the effective date of this article need not apply for a sewer connection permit. Notwithstanding the foregoing, any person proposing a change in the nature, characteristics or constituents of its wastewater, or who proposes to increase its discharge so that the daily volume, strength, or rate of its discharge is at least ten (10) percent greater than its existing and/or currently permitted discharge shall, no less than thirty (30) days prior to the proposed change or increase, apply to the municipality for issuance of a sewer connection permit or, if applicable, modification of its existing sewer connection permit.
(Ord. No. D395, 10-18-96)
Ask a question about Brockton law
Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.