For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.80 — FLOOD RESILIENCE STANDARDS

Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Zoning Ordinance § 22.80

Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/d367a4d5-fc31-4441-9da9-b790b8d09372

22.80 - FLOOD RESILIENCE STANDARDS

22.81 Statement of Purpose. The purpose of this Section is to promote building designs that are resilient to the impacts of flood events that are likely to become more frequent and intense due to the effects of climate change. These standards are informed by future projections, based on up-to-date scientific research, rather than historical occurrences of flooding. These standards are intended to account for the differing needs of buildings and sites and provide flexibility to use different measures to promote resilience. They are also intended to work in tandem with environmental standards promulgated by the Department of Public Works (DPW). 22.82 Applicability. This Section shall apply to development subject to Section 22.20 Green Building Requirements, and to other development as set forth elsewhere in this Zoning Ordinance. 22.83 Flood Elevation Standards. 22.83.1 Promulgation. (a) The City Engineer shall promulgate, and shall revise from time to time, the projected elevations of future flood risk due to certain types and probabilities of flood events for every lot in the City of Cambridge. The resulting projected elevations are referred to herein as Long-Term Flood Elevations ("LTFEs"). (b) LTFEs shall be determined for flood risk due to precipitation based on piped infrastructure using the City's hydraulic model, and for flood risk due to sea level rise and storm surge based on climate modeling performed by or endorsed by the Commonwealth of Massachusetts's agencies and determined by the City Engineer to represent the most reliable and up-to-date scientific analysis of future climate conditions. Whenever promulgating new LTFEs, the City Engineer shall document the source data used to determine the LTFEs and shall provide an explanation of why such data was selected. (c) LTFEs shall be based on an approximately 50-year projection from the time of promulgation. For example, LTFEs promulgated in or around the year 2020 shall anticipate flood risks in or around the year 2070. The City Engineer shall identify the projected timeframe when promulgating LTFEs. (d) LTFEs shall be represented in vertical feet relative to the Cambridge City Base (CCB) datum. (e) LTFEs shall be presented in the form of data tables that provide the numerical LTFEs for each parcel identified on the Cambridge Assessing Map and may also be presented in the form of a physical or digital map (for example, the Cambridge "FloodViewer" or any successor map) illustrating the LTFEs for different probabilities of flood risk for different types of flooding (i.e., precipitation, sea level rise, and storm surge) across the City. Such a map may be presented and/or illustrated in relation to ground elevation data collected by the City of Cambridge through light detection and ranging (LIDAR) or other technology; however, if a property owner provides a property survey performed by a licensed surveyor, such survey shall be considered more accurate than ground elevation data collected by the City of Cambridge. Property surveys shall not alter the LTFEs but may affect the relative difference between the LTFE and the Grade on a given parcel. (f) New or revised LTFEs shall be made available to the public for comment no less than 90 days prior to final promulgation. 22.83.2 Application in Zoning. (a) For the purpose of this Section, the following LTFE standards promulgated by the City Engineer as set forth above shall be applicable to development on a lot or development parcel: (1) The 1%-Probability Long-Term Flood Elevation standard, or "1%-LTFE standard," shall refer to the projected elevation of floodwater that has a one percent annual chance of occurrence due to either sea level rise and storm surge or due to precipitation, whichever is higher. (2) The 10%-Probability Long-Term Flood Elevation standard, or "10%-LTFE standard," shall refer to the projected elevation of floodwater that has a ten percent annual chance of occurrence due to either sea level rise and storm surge or due to precipitation, whichever is higher. (b) For the purpose of this Section, then current LTFE standards shall be applicable to a lot or development parcel beginning on the date of final promulgation. However, a development proposal that has already submitted a LTFE plan that has been approved in writing by DPW, in accordance with Section 22.85 below, shall not be subject to LTFE standards promulgated after the date of such written approval, provided that the proposal receives all necessary permits including but not limited to a building or special permit and proceeds thereafter continuously and expeditiously to completion. 22.84 Development Standards. 22.84.1 Protection. A Story Above Grade or portion thereof shall be considered protected from flooding to a specified LTFE standard if its finished floor is higher in elevation than the LTFE standard, or if its finished floor is lower than the LTFE standard, there are permanent or passively deployable barriers in place at the height of the LTFE standard adequate to fully prevent the entry of floodwater into the building's interior. A Story Below Grade or any portion thereof shall be considered a finished floor protected from flooding to a specified LTFE standard if the LTFE standard is below the Grade adjoining the building, or if the LTFE standard is above the Grade adjoining the building, there are permanent or passively deployable barriers in place at the height of the LTFE standard adequate to fully prevent the entry of floodwater into the interior of the Story Below Grade. The following standards shall apply: (a) All occupiable spaces within the building, as defined in the State Building Code, shall be protected to the 10%-LTFE standard, except that small entryways, vestibules, or lobbies with a finished floor below the 10%-LTFE standard are allowed to not be protected if they contain stairs, ramps, or lifts that allow occupants to travel to portions of the building that are protected, and if they meet the standards for "Recovery" set forth in Section 22.84.2 below. (b) Habitable spaces for residential use, as defined in the State Building Code, shall be protected to the 1%-LTFE standard. (c) The following critical building equipment within the building or on the site shall be protected to the 1%-LTFE standard: mechanical heating and cooling systems including fuel storage tanks, supply meters, shut-off switches and building management system controls; electrical power supply, transformers, panels, switchgear, and safety equipment including electrical shut-off equipment, backup generators and their fuel sources; water heaters and water supply related equipment; telecommunications equipment; elevator and lift equipment. 22.84.2 Flood Recovery. A portion of a building shall be considered recoverable from the impact of flooding if floodwater is able to enter and leave the space without causing damage that cannot be readily repaired. This can be achieved through various strategies, including using permanent or contingent measures that prevent or provide resistance to flood damage, or that can be easily repaired or replaced if damaged. Portions of a building located at or below the 10%-LTFE standard that are not required to be protected in Section 22.84.1 above shall be designed to be recoverable. 22.84.3 Modifications. Upon granting a special permit, the Planning Board may approve modifications to the development standards set forth in Section 22.84.1 and 22.84.2 above after finding that a proposed development is designed to meet the intent of the standards in a manner that is more suitable to the unique conditions of the development or the site. No such modification may be approved under this section unless it has been reviewed and approved in writing by the City Engineer. 22.85 Administrative Review Procedures. Before applying for any special permit from the Planning Board, any development review procedure under Article 19.000 of the Zoning Ordinance, or a Building Permit, whichever occurs sooner, the documentation listed below shall be submitted to the Department of Public Works (DPW) for review. Within forty-five (45) days after receiving a complete set of documentation, DPW shall provide written notice that the documentation sufficiently demonstrates compliance with the requirements of this Section or shall provide a written explanation of deficiencies to be corrected in a revised submission. To verify continued compliance, revised documentation incorporating any design modifications shall be reviewed and approved by DPW in accordance with the aforementioned procedures before application for any Building Permit or Certificate of Occupancy sought after the initial submission is accepted. (a) Identification of the LTFE standards employed in the development proposal and their date of promulgation. The applicant's initial submission shall employ the LTFE standards that have been promulgated most recently prior to the applicant's submission of the required documentation. If new LTFE standards have been made available to the public for possible promulgation, such LTFE standards shall be identified in the applicant's submission and shall be applicable to the application if new LTFE standards are promulgated before DPW completes its review of the application. For a specific lot or Development Parcel for which the owner has provided a topographical survey, the City Engineer may approve LTFEs that are adjusted for the unique topography of the lot or Development Parcel. (b) Elevations and vertical cross-sections of the building and site indicating the 1%-LTFE standard and 10%-LTFE standard, the elevation of the Grade, and the elevation of all finished floors of the building, as well as the uses of all interior sections of the building and the locations of all openings in the building envelope that are below the 1%-LTFE standard and 10%-LTFE standard including pedestrian and vehicular entrances/exits and windows. All drawings shall be drawn to scale and shall include a graphic scale symbol on each drawing sheet. (c) A written summary of the technical approaches to meeting the "Protection" and "Recovery" development standards set forth in this Section for any portions of the building located at or below the 1%-LTFE standard or 10%-LTFE standard, including but not limited to the types of flood barriers to be employed and the types of construction materials to be used within such portions of the building. (d) A narrative describing any proposed alternative approaches to meeting the intent of the development standards set forth in this Section, if the proposal is seeking approval of any modifications to such standards. 22.86 Implementation. (a) The DPW Commissioner shall have the authority to promulgate regulations for the implementation of the provisions of this Section. There shall be a ninety (90) day review period to receive public comments on draft regulations before final promulgation. (b) The Department of Public Works may develop standards and procedures appropriate to and consistent with the provisions of this Section. (c) These Flood Resilience Standards shall become effective on September 1, 2023, or on the date of final promulgation of regulations promulgated by the DPW Commissioner, whichever is first.

(Ord. No. 2022-9, 2-27-2023)

Ask a question about Cambridge law

Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.