§ 8.61.010 — Definitions
Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Code of Ordinances § 8.61.010
Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/d47ddf39-485b-4abd-b8b3-6287adbda5a8
8.61.010 - Definitions.
For the purpose of this Ordinance, the following definitions shall apply: a. "Adequately Wet" means sufficiently mixed or penetrated with water to completely prevent the release of particulate material into the ambient air. b. "Asbestos-contaminated soil" means soil which has been shown by certified laboratory analysis to contain at least one percent (1%) (normalized area) asbestos, using the Protocol for Screening Soil and Sediment Samples for Asbestos Content, most currently used by the U.S. EPA Region I laboratory and soil within thirty-five (35) feet of a sampling location in which asbestos has been detected on property shown to contain soil with at least one percent (1%) asbestos as defined above and soil the Commissioner reasonably expects may contain at least one percent (1%) asbestos based on data from an approved Asbestos Soil Sampling Plan. c. "Asbestos" or "Asbestiform" means the following hydrated minerals: chrysotile (fibrous serpentine), crocidolite (fibrous riebeckite), amosite (fibrous cummingtonite-grunerite), fibrous tremolite, fibrous actinolite, and fibrous anthophyllite. d. "City" means the City of Cambridge. e. "Commissioner" means the City of Cambridge Commissioner of Health or his/her designee. f. "Responsible party" means the owner of the property in question or an agent assigned by the owner. g. "Soil-disturbing activities" means excavation, grading, tilling, or any other such activity that may cause release of fugitive dust. Disturbance shall not include direct-push or vibratory installation or extraction of piles, sheet pile, or wells, but shall include any excavation in the vicinity of such direct-push or vibratory installation, e.g. for the construction of pile caps. Disturbance also shall not include drilling of boreholes twelve (12) inches in diameter or less by hollow stem auger or similar method for the purpose of environmental evaluation or remediation.
Ask a question about Cambridge law
Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.
