§ 8.61.040 — Asbestos Soil Management Plan
Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Code of Ordinances § 8.61.040
Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/0ec588a5-91c6-4ea1-ad56-e522920be587
8.61.040 - Asbestos Soil Management Plan.
Upon completion of all required asbestos analysis provisions, the responsible party shall undertake precautions to prevent fugitive dust from being generated and/or escaping during any soil-disturbing activities. These measures must be detailed in an Asbestos Soil Management Plan. a. This plan shall be submitted to the Commissioner for prior approval and shall include one or more of the following particulate dust mitigation and assurance measures: (i) assuring that the soil is adequately wet during soil disturbing activities; (ii) erecting wind fences around the area containing asbestos-contaminated soil during the entire time that it is being disturbed; (iii) conducting hourly air monitoring for particulate dust and continuous air monitoring for airborne asbestos around the perimeter of the soil-disturbing activity; (iv) covering the site with a layer of clean fill, which must be of sufficient depth such that the proposed disturbance of the soil would occur in and affect only that clean fill layer; (v) erecting a permanent or temporary structure maintained at partial vacuum sufficient to contain all fugitive dust, with off gas from the evacuation system treated with HEPA filtration; b. Each Asbestos Soil Management Plan will include a contingency plan for immediate work stoppage in the event that dust standards established in the Asbestos Soil Management Plan are exceeded in any two hourly field tests over a 24-hour period. Each Asbestos Soil Management Plan will also include a contingency plan for work stoppage in the event that the airborne asbestos standard established in the Asbestos Soil Management Plan is exceeded after continuous daily testing has been completed, no later than 24 hours after the cumulative daily samples have been collected. Work may recommence when containment measures deemed sufficient by the Commissioner to prevent further exeedences have been implemented. Any further exceedences will result in immediate work stoppage. c. Prior to the final decision on the Asbestos Soil Management Plan, the Commissioner shall make available for public review for a period of 20 calendar days all data resulting from the Asbestos Soil Sampling Plan, the proposed Asbestos Soil Management Plan, and the Commissioner's draft decision. The applicant shall provide written notice of the availability of the documents to abutters and to any person who otherwise requests notice and shall provide copies of the soil sampling results, proposed Asbestos Soil Management Plan, and Commissioner's draft decision upon request. A copy of the documents shall be available for public viewing at the Commissioner's office and the main branch of the Cambridge Public Library. Public comments shall be submitted in writing to the Commissioner and must be received by the Commissioner prior to the end of the 20-calendar day period in order to be considered. Mitigation measures (a) (iv) and/or (a) (v) must be include in the soil management plan if any of the following conditions are present: (a) the level of contamination is serious, i.e. at least one 5% asbestos sample and a mass of asbestos greater than 20,000 pounds; (b) the proposed soil disturbance is extensive, i.e. 20,000 ft. footprint or greater; (c) the proposed soil disturbance is in close proximity to residential areas or children's play areas, i.e. within 500 feet.
Ask a question about Cambridge law
Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.