§ 8.61.030 — Asbestos Soil Sampling Plan
Code of Ordinances of the City of Cambridge, Massachusetts (Codified through Ordinance No. 2025-8, passed April 7, 2025 (Supp. No. 14)) · Cambridge Code of Ordinances § 8.61.030
Corpus is an independent public-information project, not the official City of Cambridge website. Stable reference: corpuslaw.us/code/06e1dcb8-9a2d-4b98-97b7-2b866a197b02
8.61.030 - Asbestos Soil Sampling Plan.
a. Such a property, once determined to be subject to the provisions of this ordinance and prior to any soil disturbing activity, will require an Asbestos Soil Sampling Plan to be submitted for approval to the Commissioner at the Cambridge Public Health Department. b. If no soil-disturbing activity is anticipated in asbestos-contaminated soil, the property will not be required to submit an Asbestos Soil Sampling Plan. However, all properties with asbestos-contaminated soil will receive a Notice of Asbestos-Contaminated Soil which will be maintained as a public record by the City's Inspectional Services Department and Public Health Department. For such properties on which no soil-disturbing activity is anticipated, no further action will then be required. Any subsequent soil-disturbing activity contemplated by the responsible party will make that property subject to the provisions detailed in this ordinance and will require the responsible party to submit an Asbestos Soil Sampling Plan as described herein. Each property where it is proven to the satisfaction of the Commissioner that asbestos-contaminated soil no longer exists shall have its Notice of Asbestos-Contaminated Soil rescinded. c. The minimum requirement for an Asbestos Soil Sampling Plan is composite sampling to a depth of at least three (3) feet, or to the maximum depth of proposed soil-disturbing activities, using thirty-five (35) foot on-center sample locations distributed across the site in all areas where soil disturbing activities are proposed or anticipated. The Commissioner must approve the Asbestos Soil Sampling Plan before sampling at the site begins. Once completed, the data generated under the sampling plan will be submitted to the Commissioner and maintained by the Commissioner as a public record. Areas of asbestos-contaminated soil which are to be subject to soil-disturbing activities may require further characterization as determined by the Commissioner.
Ask a question about Cambridge law
Corpus searches the Cambridge sections it holds and shows the ones that match, with their citations. Free, no sign-in.