For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 272-54 — Permit application; issuance

Code of Ordinances, City of Lowell, Massachusetts · Lowell Code of Ordinances § 272-54

Corpus is an independent public-information project, not the official City of Lowell website. Stable reference: corpuslaw.us/code/ac7f0227-3164-4d9c-9dae-b04bf3e2f120

§ 272-54: Permit application; issuance.

A. Users required to obtain an industrial discharge permit shall complete and file with the City an application in the form prescribed by the City and accompanied by a fee as provided in Chapter 150, Fees. B. Existing users shall apply for an industrial discharge permit within 60 days after the effective date of the ordinance from which this article derives (Ordinance Number 1-1987), and proposed new users shall apply at least 90 days prior to connecting to or contributing to the POTW. In support of the application, the users shall submit, in units and terms appropriate for evaluation, the following information: (1) Name, address, and location (if different from the address). (2) SIC number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended. (3) Wastewater characteristics and constituents, including but not limited to those mentioned in §§ 272-44 and 272-45 of this Part 2, as determined through analysis done by an approved analytical laboratory. (a) All analysis shall be performed in accordance to Section 304(g) of the Act and as contained in 40 CFR 136, as amended. (b) In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass, where required by the standard or control authority) of pollutants in the discharge from each process. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations. (c) The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this Subsection B(3). (d) Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the process if no pretreatment exists. If other wastewaters are mixed with the wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined waste stream formula of 40 CFR 403.6(e) in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e), this adjusted limit along with supporting data shall be submitted to the control authority. (e) Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 CFR 136 and amendments thereto. Where 40 CFR 136 does not contain sampling or analytical techniques for the pollutant in question, or where the Administrator determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the POTW or other parties, approved by the Administrator. (f) The control authority may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. The baseline report shall indicate the time, date and place of sampling and methods of analysis and shall certify that such sampling and analysis are representative of normal work cycles and expected pollutant discharges to the POTW. (4) Time and duration of contribution. (5) Average daily and three-minute peak wastewater flow rates, including daily, monthly and seasonal variations if any. (6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, and appurtenances by the size, location and elevation. (7) Descriptions of activities, facilities and plant processes on the premises, including all materials which are or could be discharged. (8) Compliance schedule report. If additional pretreatment and/or operation and maintenance (O & M) will be required to meet the pretreatment standards as indicated by the certification statement required by Subsection B(13), the shortest schedule by which the use will provide such additional pretreatment must be followed. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. (a) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). (b) No increment referred to in Subsection B(8)(a) shall exceed nine months. (c) Not later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the Executive Director including, as a minimum, whether or not it complied with the increment or progress to be met on such date and, if not, the date on which its expects to comply with this increment or progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the Executive Director. (9) Each product produced by type, amount, process or processes and rate of production. (10) Type and amount of raw materials processed (average and maximum per day). (11) Number and type of employees and hours of operation of plant and proposed or actual hours of operation of pretreatment systems. (12) The pretreatment standards applicable to each regulated process. (13) Certification. A statement, reviewed by an authorized representative of the industrial user (as defined in § 272-19) and certified to by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O & M) and/or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements. (14) Permits. The user shall submit a list of any environmental control permits held by or for the facility. (15) Any other information as may be deemed by the Executive Director to be necessary to evaluate the permit application. C. The City will evaluate the data furnished by the user and may require additional information. The City reserves the right to deny or condition new or increased contributions of pollutants, or changes in the nature of pollutants, to the POTW by industrial users where such contributions do not meet applicable pretreatment standards or requirements or where such contributions would cause the POTW to violate its NPDES permit. After evaluation and acceptance of the data furnished, the City may issue an industrial discharge permit subject to terms and conditions provided herein. Editor's Note: Amended at time of adoption of Code (see Ch. 1 , General Provisions, Art. II ).

[Amended 12-13-1988 ]

Ask a question about Lowell law

Corpus searches the Lowell sections it holds and shows the ones that match, with their citations. Free, no sign-in.