For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 272-81 — Public notice of significant noncompliance

Code of Ordinances, City of Lowell, Massachusetts · Lowell Code of Ordinances § 272-81

Corpus is an independent public-information project, not the official City of Lowell website. Stable reference: corpuslaw.us/code/cb4f8cfc-f98b-476a-bab8-c801870f7526

§ 272-81: Public notice of significant noncompliance.

If over a twelve-month period there exists the occurrence of a significant noncompliance, the public shall be made aware of this fact through the publication of said significant noncompliances in the largest daily newspaper in the area, as specified in the public participation requirements of 40 CFR 25 in the enforcement of national pretreatment standards. For the purposes of this section, an industrial user is in significant noncompliance if its violation meets one or more of the following criteria: A. Chronic violations of wastewater discharge limits, defined here as those in which 66% or more of all of the measurements taken during a six-month period exceed (by any magnitude) the daily maximum limit or the average limit for the same pollutant parameter. B. Technical review criteria (TRC) violations, defined here as those in which 33% or more of all of the measurements for each pollutant parameter taken during a six-month period equal or exceed the product of the daily maximum limit or the average limit multiplied by the applicable TRC (TRC equals 1.4 for BOD, TSS, fats, oil, and grease and 1.2 for all other pollutants except pH). C. Any other violation of a pretreatment effluent limit (daily maximum or longer-term average) that the control authority determines has caused, alone or in combination with other discharges, interference or pass-through (including endangering the health of POTW personnel or the general public). D. Any discharge of a pollutant that has caused imminent endangerment to human health, welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such a discharge. E. Failure to meet, within 90 days after the schedule date, a compliance schedule milestone contained in a local control mechanism or enforcement order for starting construction, completing construction, or attaining final compliance. F. Failure to provide, within 30 days after the due date, required reports such as baseline monitoring reports, ninety-day compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules. G. Failure to accurately report noncompliance. H. Any other violation or group of violations which the control authority determines will adversely affect the operation or implementation of the local pretreatment program.

[Added 8-13-1991 ; amended 5-31-1994 ]

Ask a question about Lowell law

Corpus searches the Lowell sections it holds and shows the ones that match, with their citations. Free, no sign-in.