§ 272-71 — Self-monitoring regulations
Code of Ordinances, City of Lowell, Massachusetts · Lowell Code of Ordinances § 272-71
Corpus is an independent public-information project, not the official City of Lowell website. Stable reference: corpuslaw.us/code/283f4820-41d7-487d-94c5-64256e3fd26b
§ 272-71: Self-monitoring regulations.
A. Requirements. Periodic measurements of flow, pollutant concentrations and other appropriate waste characteristics shall be made by those users specifically designated by the Executive Director. The Executive Director shall determine the type of sampling required. Upon request all samples taken by the industrial user shall be divided with the City for testing as specified by the Executive Director. Continuous monitoring may be required in cases involving large fluctuations in quantity or quality of wastes or if the wastewater appears to have characteristics which may damage the treatment system. The acceptability of any monitoring results shall be determined by the Executive Director. Self-monitoring frequency, parameters, and location shall be specified by the Executive Director and stated on the user's discharge permit. B. Monitoring facilities. The City shall require to be provided and operated at the user's own expense monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility should normally be situated on the user's premises, but the City may, when such location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user. Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with the City's requirements and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the City. C. Analysis. All measurements, tests and analyses of the characteristics of wastewaters to which reference is made in this article shall be determined in accordance with 40 CFR 136 and its amendments. All sampling shall take place at locations designated by the Executive Director after review of an industrial discharge permit application and site investigations, as provided in Subsection B. All requirements for monitoring of wastewater discharges shall be determined by the Executive Director and shall be found in the user's industrial discharge permit. Any costs associated with the sampling and testing of the industry's effluent shall be paid by the individual industry.
[Amended 12-13-1988 ]
Ask a question about Lowell law
Corpus searches the Lowell sections it holds and shows the ones that match, with their citations. Free, no sign-in.