§ 4-12 — Water line capacity

Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 4-12

Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/a3703f48-28aa-437f-8b54-137797385720

Sec. 4-12. - Water line capacity.

(a) Scope. (1) A CAPF for water line capacity (CAPF-WL) is not required for a development project for which a master plan is unconditionally approved pursuant to the LMC before April 15, 2007. (2) A CAPF-WL is not required for a development project to be constructed entirely on a lot of record if the development project does not require more than a twenty (20) percent increase in water line capacity over the existing development and consists solely of one or more of the following: (A) the change of use of an existing structure; (B) the renovation, with no addition of square footage, of an existing structure; (C) the construction of an addition of five thousand (5,000) square feet or less to an existing structure; or (D) the demolition of an existing structure and replacement with a structure no more than five thousand (5,000) square feet larger than the one demolished. (b) Adequacy. (1) The Director shall determine whether water line capacity is adequate based on the criteria set forth in this subsection. Water line capacity is deemed adequate if: (A) The storage tanks, lines, and local pumping stations have sufficient available capacity to provide maximum daily demand to the proposed development and meet peak hour demand in addition to fire flow, taking into account existing and approved system demands; and (B) The existing distribution system is capable of providing normal required pressure as well as minimal residual pressure to the proposed development. (2) Additional capacity. The Director may consider additional water line capacity resulting from construction within the first two (2) years of the City or County CIP as of the date of the application. (c) Issuance of CAPF-WL. (1) If the Director determines that the water line capacity is adequate based on the criteria of subsection (b) of this section, the Director shall issue a CAPF-WL for the project. (2) If the Director determines that the water line capacity is not adequate, the Director shall deny the CAPF-WL. Subject to subsection (d) of this section, the master plan, plat, or site plan application will not be scheduled for consideration by the Commission. (d) Mitigation. If the Director denies a CAPF-WL, a developer may mitigate the impact of the proposed development in accordance with Article IV of this chapter. (e) Water taps. Granting of a CAPF-WL for a project may not be construed as a guarantee of water taps or an allocation for the project.

(Ord. No. G-19-42, § I, 12-19-19)