§ 4-13 — Sewer line capacity
Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 4-13
Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/5cdf287d-1326-4ce8-90f1-6435415262dd
Sec. 4-13. - Sewer line capacity.
(a) Scope. (1) A CAPF for sewer line capacity (CAPF-SL) is not required for a development project for which a master plan is unconditionally approved pursuant to the LMC before April 15, 2007. (2) A CAPF-SL is not required for a development project to be constructed entirely on a lot of record if the development project does not require more than a twenty (20) percent increase in sewer line capacity over the existing development and consists solely of one or more of the following: (A) the change of use of an existing structure; (B) the renovation, with no addition of square footage, of an existing structure; (C) the construction of an addition of five thousand (5,000) square feet or less to an existing structure; or (D) the demolition of an existing structure and replacement with a structure no more than five thousand (5,000) square feet larger than the one demolished. (b) Adequacy. (1) The Director shall determine whether sewer line capacity is adequate based on the criteria set forth in this subsection. (2) Sewer line capacity is deemed adequate if the sewer interceptors, lines, and local pump stations have sufficient capacity to accommodate the ultimate peak flow for the proposed project taking into account existing and approved system demands. (c) Issuance of CAPF-SL. (1) If the Director determines that the sewer line capacity is adequate based on the criteria of subsection (b) of this section, the Director shall issue a CAPF-SL for the project. (2) If the Director determines that the sewer line capacity is not adequate, the Director shall deny the CAPF-SL and the master plan, plat, or site plan will not be scheduled for consideration by the Commission, subject to subsection (d) of this section. (d) Mitigation. If the Director denies a CAPF-SL, a developer may mitigate the impact of the proposed development in accordance with Article IV of this chapter. (e) Sewer taps. Granting of a CAPF-SL for a project may not be construed as a guarantee of sewer taps or an allocation for the project.
(Ord. No. G-19-42, § I, 12-19-19)
Ask a question about Frederick law
Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.