For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-14 — Roads

Code of the City of Frederick, Maryland (Codified through Ordinance No. G-26-1, adopted April 2, 2026. (Supp. No. 112, 8-26)) · Frederick City Code § 4-14

Corpus is an independent public-information project, not the official City of Frederick website. Stable reference: corpuslaw.us/code/3670ed10-f263-4914-9054-54fae5d75e70

Sec. 4-14. - Roads.

(a) Definition. For purposes of this section, "peak hour" means the one-hour period of greatest utilization of a transportation facility; weekdays normally have an a.m. peak and a p.m. peak. (b) Scope. (1) A CAPF for roads (CAPF-R) is not required for a development project if the project is expected to generate no more than 50 peak hour new vehicle trips. (2) A CAPF-R is not required for a development project to be constructed entirely on a lot of record if the development project does not require more than a 20% increase in road capacity over the existing development and consists solely of one or more of the following: (A) the change of use of an existing structure; (B) the renovation, with no addition of square footage, of an existing structure; (C) the construction of an addition to an existing structure if addition is 5,000 square feet or less; or (D) the demolition of an existing structure and replacement with a structure no more than 5,000 square feet larger than the one demolished. (3) Except as otherwise provided in this paragraph, all roads, including county and state roads, are subject to the requirements of this section. The following interstate highways, excluding on/off ramps, are exempt from the requirements of this section: (A) I-70; (B) I-270; (C) U.S. 15 (Frederick Freeway, between U.S. 40 and Monocacy Blvd./Christopher's Crossing); and (D) U.S. 40 (between I-270 and U.S. 15). (4) This paragraph applies to a development project for which an application for a master plan, plat, or site plan, whichever is submitted first for that project, is submitted on or after October 1, 2022. A CAPF-R is not required for a project located entirely within the Downtown Frederick Mobility Fee District established under Section 4-14.1 of this article. (c) Adequacy. (1) The Director shall determine whether roads and intersections are adequate based on the criteria set forth in this subsection as well as the applicable provisions of LMC Section 1203, taking into consideration existing and approved development. (2) Roads and intersections are adequate if a LOS of D or better is maintained on all evaluated road segments, for each turning movement at an intersection, and for the overall intersection. For each turn lane in the study area, the 95 th percentile of the queue lengths shall not exceed the length of the turn lane. (3) The Commission may (in its sole discretion) determine that the existing roads and intersections are adequate if: (A) adequacy cannot be achieved without alteration or removal of existing structures; and (B) the developer has incorporated as much mitigation as reasonably possible. (4) Peak hour trips. (A) In determining the total peak hour vehicle trips generated by the proposed development project during the peak hour of the adjacent street traffic, the Director will include all land at one location within the city under common ownership or control of the developer. (B) For purposes of this paragraph, "at one location" means all adjacent land the property lines of which are contiguous or nearly contiguous at any point. (5) A developer may not avoid the requirements of this section by submitting piecemeal applications for plats or site plans. If a developer seeks approval of only a portion of a development project that generates fewer than fifty (50) peak hour trips, when the developer seeks approval of the rest of the project, the previously approved trips will be included as new trips in the new submittal. (6) The capacity of any road funded for construction within two (2) years of the date of application pursuant to the City or County CIP or state CTP may be considered in the application of the adequacy test. (7) If the LOS meets the criteria but changes the grades by two (2) or more levels, the Director will review the project and may require mitigation before issuance of a CAPF-R. (d) Issuance of CAPF-R. (1) If the Director determines that the roads and intersections are adequate based on the criteria of subsection (c) of this section, the Director shall issue a CAPF-R for the project. (2) If the Director denies the CAPF-R, the master plan, plat, or site plan application will not be scheduled for consideration by the Commission, subject to subsection (d) of this section. (e) Mitigation. If the Director denies a CAPF-R, a developer may mitigate the impact of the proposed development in accordance with Article IV of this chapter.

(Ord. No. G-19-42, § I, 12-19-19; Ord. No. G-22-10, § V, 8-18-22)

Ask a question about Frederick law

Corpus searches the Frederick sections it holds and shows the ones that match, with their citations. Free, no sign-in.