For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-123 — Abandonment of structure

Code of Ordinances, City of Portland, Maine (Chapters as revised by the City Clerk, latest revision September 9, 2026 (each chapter carries its own revision date)) · Portland Code of Ordinances § 25-123

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/cf564164-f2cb-4b76-9905-069ef86bf168

Sec. 25-123. Abandonment of structure.

(a) Whenever the use of a substructure is abandoned, except the abandonment of service lines designed to serve single properties, the person or utility owning, using, controlling, or having an interest therein, shall within thirty (30) days after such abandonment, file with the city a statement in writing giving in detail the location of the substructure so abandoned. If such abandoned substructure is in the way, or subsequently becomes in the way, of an installation of the city or any other public body, the owner of such substructure, after having been contacted by the excavator, shall establish if the substructure is abandoned and make the first cut or tap before allowing the substructure to be removed by the excavator. (b) When gas or other flammable service to buildings is discontinued, the existing service line for such service shall be terminated at a point outside the building.

(Ord. No. 10-97, 6-16-97)

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.