Sec. 25-133. Excavations during winter.

(a) No person or utility shall be granted a street opening permit or open any paved area from the time of November fifteenth of each year to April fifteenth of the following year unless an emergency or special condition exists and permission is obtained in writing from the city. (b) Any person or utility wishing to obtain a street opening permit between these aforementioned dates shall first explain fully in writing the emergency situation or special condition existing to the city before a permit application will be considered for approval. If an emergency condition which could endanger life or property exists, excavation work shall not be delayed by this section; however, a written explanation shall be delivered to the city as part of the street opening permit application made in accordance with §25-128. In the rare event that a non-emergency permit is issued between the aforementioned dates for an excavation into a paved area, a moratorium surcharge of one thousand dollars ($1,000.00) will be added to the regular permit fee. This moratorium surcharge may be waived by the director if specific weather conditions exist and paved area restorations are in compliance with normal construction season standards, as described in the rules and regulations. (c) For the purpose of this section, an emergency shall be defined as one (1) of the following: damaged or leaking water or gas conduit systems, damaged, plugged or leaking sewer or storm drain conduit systems, damaged underground electrical and communications facilities, or downed or seriously damaged overhead pole structures; all remaining excavations will be considered non-emergency situations and may only be authorized upon written documentation of special circumstances.

(Ord. No. 10-97, 6-16-97; Ord. No. 71-00, 9-18-00; Ord. No. 253-15/16, 7/1/2016)