For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-875 — - Hot water heating - Piping

Code of Ordinances of the City of Dearborn, Michigan (2026 S-07: Code and Zoning updated through September 22, 2026) · Dearborn City Code § 5-875

Corpus is an independent public-information project, not the official City of Dearborn website. Stable reference: corpuslaw.us/code/2ff6588b-fffc-4d55-bf86-e0182b980e36

Sec. 5-875. - Hot water heating - Piping.

(a) Brass, copper, black standard steel or wrought iron pipes and fittings shall be used on all hot water heating systems except under special conditions when, if approved by the heating board of appeals, other safe material may be used. (b) No part of the piping on a hot water heating system shall be laid in any coal bin unless protected by suitable removable tile or other approved material to keep piping from direct contact with coal and to permit examination. (c) Hot water piping, used for under the floor space heating, commonly known as radiant heating, shall be buried in concrete of sufficient strength and thickness to carry the floor load as provided for in the building code, with a minimum thickness of three inches with at least two inches of concrete over such piping and shall be laid level on a solid foundation over a four-inch gravel fill, as recommended by the manufacturer's specifications, to eliminate any possibility of air pockets in the system, with provisions made for drainage at one or more points. Radiant heat piping shall be made of wrought iron, copper, or brass with welded, brazed or soldered joints. All copper radiant heat piping shall be tested by the installer with water, air, or gas at 60 pounds per square inch for a period of 30 minutes without any drop in pressure, to the satisfaction of the heating inspector. Wrought iron and brass radiant heat piping shall be tested by the installer with water, air or gas at 200 pounds per square inch for 30 minutes without any drop in pressure to the satisfaction of the heating inspector. Hot water heat piping installed in floors of dwellings which are built directly on the ground, at grade level, shall be installed on a solid slab of cement concrete at least one inch in thickness over a four-inch gravel fill or on a solid slab of zonolite concrete or its equivalent at least one inch in thickness, over a four-inch gravel fill in accordance with the manufacturer's specifications. A vapor barrier of asphalt-saturated building paper equal to a 30-pound felt with a four-inch lap, shall be installed over the zonolite or cement concrete base under the piping. One inch asphalt insulation must be installed along the outer edge of the floor slab and extend two feet under the floor as a border insulation to be placed over the moisture barrier, in accordance with Sketch No. 1 shown herewith. (d) Piping installed in the ceiling of dwellings for space heating shall be installed in accordance with the manufacturer's specifications with proper insulation to prevent undue heat loss or the accumulation of moisture on the ceiling. (e) All supply and return piping run in exterior walls, except in cases opening directly to rooms through which they pass, shall be insulated with asbestos or other approved covering at least three-fourths inch thick. (f) All low points in any hot water heating system shall be provided with means for drainage. (g) All hot water heating pipes shall be run to permit expansion and contraction without undue strain on the pipe or fittings, using swing joints or expansion joints to accomplish the above. (h) No cutting of girders, beams joists, studs or other structural members to permit passage of hot water heating pipes will be permitted, except as approved by the building inspector. (Ord. No. 81-65, § 7.10, 11-4-81)

Ask a question about Dearborn law

Corpus searches the Dearborn sections it holds and shows the ones that match, with their citations. Free, no sign-in.