Section 3.25. - Site condominiums.
A. A site condominium unit shall be a unit created by the division of land on the basis of condominium ownership that is not subject to the platting provisions of the Land Division Act, Public Act No. 288 of 1967, as amended (MCL 560.101 et seq.). B. A site condominium unit shall be treated as a separate lot or parcel and may have buildings constructed on it and uses conducted within it as allowed in its zoning district provided the unit meets the development requirements for the zoning district in which it is located. C. Site plan approval: Preliminary site plan: 1. A preliminary site plan shall be reviewed and approved by the Planning commission and city commission in accordance with chapters 13 and 14. 2. Approval of a preliminary site plan shall for a period of two years confer upon the proprietor approval of lot sizes, lot orientations, and street layouts. 3. Three separate one-year extensions may be granted by the city commission if applied for in writing prior to the date of expiration of approval of the preliminary site plan. 4. After a period of two years from approval, unless extensions as provided for in this chapter have been granted, the preliminary site plan approval shall become null and void if substantial construction has not commenced and proceeded in a meaningful manner. Final site plan: 5. A final site plan for the site condominium project must be approved by the city commission prior to the issuance of any building permit for any structures on the proposed site, unless they already exist. 6. At its regular meeting or at a meeting called within 20 days of the date of submission, the city commission shall examine the final plan for general compliance with this ordinance. The proprietor or his designated representative may request an extension of the 20-day time limit, which the city commission may grant at its discretion. 7. To receive final approval for the site condominium project, the owner shall submit ten copies of the plan to the city Engineer who shall place the final plan on the agenda of the city commission, said plan to contain the information required by this ordinance. Copies of the final plan shall be distributed to the appropriate city departments for their review and comment to the city commission. Building permit: 8. Prior to the issuance of a building permit for any building in the proposed site condominium project, the following items must be fulfilled, unless waived by the appropriate city department. The city commission may consider the issuance of building permits prior to the approval of the final site plan in exceptional or unusual circumstances beyond the ability of the applicant to control. a. Proposed master deed. b. Articles of incorporation for the condominium association. c. Improvement plan approval. d. Block grading, floodway, soil erosion approval. e. Basement elevation and building restriction approval. f. Construction of hydrant water, adequate fire access, stormwater detention, floodways, and soil erosion controls. D. Monuments shall be set at all boundary corners and deflection points and at all street right-of-way intersection corner and deflection points. Lot irons shall be set at all condominium site corners and deflection points of condominium site lines. E. The city Engineer may grant a delay in the setting of required monuments or irons for a reasonable time, but not to exceed one year from the date of approval by the city commission, on condition that the developer deposit with the city Clerk cash, a certified check, or an irrevocable bank letter of credit running to the city, whichever the developer selects, in an amount as determined from time to time by resolution of the city commission. 1. The deposit shall be returned to the developer upon receipt of a certificate by a surveyor registered in the State of Michigan that the monuments and irons have been set as required, within the time specified. 2. If the developer defaults, the city commission shall promptly engage a registered surveyor to set the monuments and irons in the ground as shown on the condominium site plan, at the developer's expense. F. All rights-of-way and utility easements shall be described separately from individual condominium sites and shall be accurately delineated by bearings and distances on the condominium subdivision plan and the final site plan. 1. The rights-of-way and utility easements shall be separately designed for their individual purpose, such as access, roadway, location, installation, maintenance and replacing of public utilities. 2. The developer shall dedicate to the city all easements for utilities. Water, sewer and electrical easements may be placed within streets, subject to the approval of the city Engineer and the standards of the city. 3. All streets proposed for any site condominium shall be developed within the minimum design, construction, inspection, approval, and maintenance requirements of this ordinance, and the subdivision control ordinance (ordinance no. 21-84, as amended).
(Ord. No. 7-03, § 3(3.25), 4-1-2003)
Ask a question about Kentwood law
Corpus searches the Kentwood sections it holds and shows the ones that match, with their citations. Free, no sign-in.