For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.33 — Solar energy systems

Code of Ordinances of the City of Kentwood, Michigan (Codified through Ordinance No. 6-26, adopted June 2, 2026. (Supp. No. 18)) · Kentwood Code of Ordinances § 3.33

Corpus is an independent public-information project, not the official City of Kentwood website. Stable reference: corpuslaw.us/code/9b6c8434-9a08-4396-97dd-fdfffdbad368

Section 3.33. - Solar energy systems.

A. Intent and purpose. 1. The intent of this section is to provide for the safe, effective and efficient utilization of solar energy systems while protecting the rights, health, safety and welfare of adjoining land uses and landowners through appropriate zoning and land use controls. B. Definitions. As used in this section, the following terms shall have the indicated meanings: 1. Accessory Use: A solar collection system consisting of one or more roof- and/or ground-mounted solar collection devices and associated supporting equipment that is primarily intended to reduce on-site consumption of utility power by generating electricity solely for the use and/or benefit of the individual property owner upon whose property the device is situated. A system is considered an "accessory" facility only if it supplies power strictly for on-site use, except that when a property upon which the facility is situated also receives electrical power supplied by a utility company, incidental excess power generated, and not immediately utilized for on-site use, may be provided to the utility company in exchange for a credit. All cases subject to Sections 3.15 & 3.16. 2. Building Integrated Solar: A solar energy system that is an integral part of a primary or accessory building or structure (rather than a separate mechanical device), replacing or substituting for an architectural or structural component of the building or structure. Building-integrated systems include, but are not limited to, photovoltaic or hot water solar energy systems that are contained within roofing materials, windows, skylights, and awnings. Also includes wall-mounted systems. 3. Community Solar: Any solar project or purchasing program, within a geographic area, in which the benefits of a solar project flow to multiple customers such as individuals, businesses, nonprofits, and other groups. 4. Ground-Mounted: A ground-mounted SES has solar panels affixed to a racking system on support posts. These posts are commonly driven into the ground, without requiring excavation for a concrete foundation. However, in cases where the soil cannot be penetrated, such as with a brownfield or capped landfill, ground-mounted SES can also be designed with ballasted supports that sit atop the ground. A ground-mounted SES may be fixed (i.e., stationary) or have single- or double-axis trackers to follow the sun throughout the day. While nearly all principal-use SES are ground-mounted, some accessory SES may be ground-mounted, too. 5. Inverter: An apparatus which converts direct current into alternating current. 6. Maximum Tilt: The maximum angle of a solar array (i.e., most vertical position) for capturing solar radiation as compared to the horizon line. 7. Photovoltaic (PV) System: A semiconductor material that generates electricity from sunlight. 8. Principal Use: Principal-use SES developments generate electricity distributed off-site through the grid and exported to a wholesale utility market. These projects occupy single or multiple large parcels of land and are typically the primary use on the site. These SES vary greatly in size, covering as little as an acre to thousands of acres. In addition, SES have two primary configurations: ground-mounted and roof-mounted. 9. Roof-Mounted Solar Energy System: A solar energy system mounted on racking that is attached to or ballasted on the roof of a building or structure. 10. Solar Energy System (SES): Solar energy is radiant light and heat from the Sun that is harnessed using a range of technologies. Solar energy systems typically use solar panels to generate electricity. When the sun shines onto a solar panel, energy from the sunlight is absorbed by the PV cells in the panel. This energy creates electrical charges that move in response to an internal electrical field in the cell, causing electricity to flow. Solar cells connected in photovoltaic modules (or solar panels) are the main mode of producing power with sunlight. 11. Substation: A set of equipment reducing the high voltage of electrical power transmission to that suitable for supply to consumers. Type of SES per Zoning District: | Low-Density Residential | Medium & High-Density Residential | Commercial/ Office | Industrial | Mixed Use | Open Space Accessory Roof- Mounted | P | P | P | P | P | P Accessory Ground- Mounted | P | P | P | P | P | P Building Integrated | P | P | P | P | P | P Freestanding Principal Use | SLU | SLU | SLU | SLU | SLU | SLU P= Permitted, SLU= Special Land Use C. Solar Energy Systems, Accessory Use. 1. This use shall be permitted in all districts. 2. Size limits. a. In Residential and Commercial Districts, the physical size of the system shall be limited to the size of the roof, or roofs of structures, situated on the subject property, when roof mounted. Ground-mounted systems shall be no larger than the square footage of solar panel surface area allowed based on the size of the lot as shown below. If a combination of roof-mounted and ground-mounted systems is utilized, the total solar panel surface area cannot exceed the aggregate square footage of the roof areas on the property on which the system is installed. b. In Industrial Districts, the physical size of the system shall be limited to the size of the roof, or roofs, of structures situated on the subject property, when roof-mounted, or no larger than the aggregate of the roof area of all permitted structures on site, when ground-mounted. Outside these guidelines will require a special land use review. c. Building integrated solar is permitted in all districts. Applicable administrative permit review is required. R/C District Lot Size | Solar Panel Surface Area Maximum Square Footage for Ground-Mounted Systems Less than or equal to one-half acre | 120 square feet More than one-half acre to one acre | 250 square feet More than one acre to 3 acres | 500 square feet More than 3 acres | Aggregate square footage of the roof, or roofs of structures, situated on the subject property D. Solar Energy Systems, Principal Use 1. This use is subject to a special land use review, pursuant to the requirements, conditions, and limitations in Section C: General Requirements, as well as the following: a) Fencing. A principal-use SES shall be secured with perimeter fencing to restrict unauthorized access. Perimeter fencing shall be a maximum of eight feet, and comply with requirements set forth in Kentwood's Zoning Ordinance, Section 3.19 C. b) Land Clearing. Land disturbance or clearing shall be limited to what is minimally necessary for the installation and operation of the system and to ensure sufficient all-season access to the solar resource given the topography of the land. Topsoil distributed during site preparation (grading) on the property shall be retained on site. c) Access Drives. Access drives within the SES shall be designed to minimize the extent of soil disturbance, water runoff, and soil compaction on the premises. The use of geotextile fabrics and gravel placed on the surface of the existing soil for temporary roadways during the construction of the SES is permitted, provided that the geotextile fabrics and gravel are removed once the SES is in operation. d) Wiring. SES wiring (including communication lines) may be buried underground. Any above-ground wiring within the footprint of the SES shall not exceed the height of the solar array at maximum tilt. e) Lighting. Lighting shall be limited to inverter and/or substation locations only. Light fixtures shall have downlit shielding and be placed to keep light on-site and glare away from adjacent properties, bodies of water, and adjacent roadways. Flashing or intermittent lights are prohibited. f) Signage. A site identification sign up to 50 square feet in area is allowed. Any signage shall meet the setback, illumination, and materials/ construction requirements of the zoning district for the project site. g) Sound. The sound pressure level of a Principal-Use SES and all ancillary solar equipment shall not exceed 45 dBA at the property line of an adjoining non-participating lot. The site plan shall include modeled sound isolines extending from the sound source to the property lines to demonstrate compliance with this standard. h) Project Infrastructure and Utility Lines. All on-site utility lines shall be placed underground to the extent feasible and as permitted by the serving utility, with the exception of the main service connection at the utility company right-of-way and any new interconnection equipment, including without limitation any poles, with new easements and right-of-way. i) Abandonment and Decommissioning. A decommissioning plan for ground-mounted systems must be submitted to ensure that the owner or operator properly removes the equipment and facilities upon the end of project life or after the useful life. The owner or operator shall decommission the solar panels in the event they are not in use for 180 consecutive days. The decommissioning plan shall include: 1. Defined conditions upon which decommissioning will be initiated (i.e. end of land lease, no power production for 12 months, abandonment, etc.) 2. Removal of all non-utility owned equipment, conduit, structures, fencing, roads, solar panels, and foundations. 3. Restoration of property to condition prior to development of the system. 4. The timeframe for completion of decommissioning activities. 5. Description of any agreement (e.g. lease) with landowner regarding decommissioning, if applicable. 6. The entity or individual responsible for decommissioning. 7. Plans for updating the decommissioning plan. 8. A performance guarantee shall be posted in the form of a bond, letter of credit, cash, or other form acceptable to the city to ensure removal upon abandonment. As a part of the decommissioning plan, the responsible party shall provide at least two (2) cost estimates from qualified contractors for full removal of the equipment, foundations, and structures associated with the facility. These amounts will assist the city when setting the performance guarantee valid throughout the lifetime of the facility. Bonds and letters of credit shall be extended on a bi-annual basis from the date of special use permit approval. E. General Requirements. 1. Setbacks. a) In Residential Zones ground-mounted facilities shall satisfy the minimum side and rear yard accessory building setback requirements for the district in which the use is situated. No facilities in the front yard shall be permitted. b. In Commercial and Industrial Districts ground-mounted facilities shall satisfy the minimum side, front, required front, and rear yard setback requirements for the district in which the use is situated. c. In Commercial Districts adjacent to residential a 45-foot setback is required, of which 20 feet nearest the respective property line is developed as a buffer zone, citing Kentwood Zoning Ordinance Section 8.03 C2. d. In Industrial Districts adjacent to residential a 100-foot setback is required but may be permitted as close as 50 feet if the area between the SES and the boundary is an unlighted landscaped buffer used for no other purpose, citing Kentwood Zoning Ordinance Section 10.03 C4. e. The Planning Commission may reduce the required setback if a buffer zone is provided that supplements landscaping, as may be determined by the Planning Commission citing Kentwood Zoning Ordinance Section 19.03. 2. Height limits. a) Ground-mounted systems may not exceed a total height of fourteen feet above existing grade at maximum tilt. Roof-Mounted SES in residential and commercial districts shall not exceed 2 feet above the finished roof and are exempt from any rooftop equipment or mechanical system screening. Roof-mounted systems in industrial districts shall not exceed 10 feet above the roof deck at maximum tilt. 3. Electrical Connections. a) If interconnected to the local utility grid, a copy of the conditional approval from Consumers Energy or DTE Energy must be provided prior to, or at the time of, permit application. 1. All systems must meet all applicable construction and electrical codes. 2. Systems that connect to the electric utility power grid shall comply with all utility notification requirements. 3. A copy of the signed certificate of completion from the utility company shall be provided prior to occupancy permit issuance. 4. When batteries are included, they must be placed in a secure container or enclosure per manufacturer's specifications. 4. Applicable Permits and Codes. a. All solar construction must meet current codes set forth by national utility regulators and the State of Michigan, including the National Electric Code (NEC), Michigan Building Code (MBC), Michigan Residential Code (MRC), and all state and local fire, building, and electrical codes. b. The system must have approval from a licensed professional engineer and obtain all applicable building and electrical permits. c. Details including a site plan, roof plan, structural information, electrical diagrams and specifications, placement of labels, and SES manufacturer specifications must be submitted prior to installation. 5. Appearance. 1. Color must remain as it was originally provided by the manufacturer or match the exterior of the principal structure. 2. No signs other than the manufacturers or installer's identification and appropriate warning signs may be on the system. 3. All panels shall have tempered, non-reflective surfaces. 4. The system cannot unreasonably interfere with the view of, or from, a site of significant public interest (Historic or natural resources). 5. Ground-mounted systems may not be affixed to a wall or a fence. 6. Roof-mounted systems shall be installed in such a manner that there is no change in relief or projection, with the exception that roof-mounted systems in industrial districts may extend 10 feet above the roof deck at maximum tilt. 7. Environmental Resources. No significant forested areas shall be removed from the site for installation of the facility. No portion of the facility shall be located within or impede upon a stream buffer, floodplain, or wetland. 8. Landscaped Buffer. Freestanding ground mounted SES shall include a landscaped buffer to screen the SES from residential uses on contiguous properties and public rights-of-way. A detailed landscaping plan shall be submitted with the site plan, which includes the type of plantings, location, and spacing to result in year-round screening from the time of installation. Part or all of the plantings shall consist of a compact hedgerow and/or native vegetation and/or earth berms. First preference is given to the use of existing or created topography and/or vegetation to reduce visual impacts. The landscaped buffer may be placed within the setback. Any perimeter fencing should be on the side of the landscaping buffer with the solar panels. Consideration will be given so that the required landscaping will not impede solar energy generation

(Ord. No. 15-24, § 1, 10-1-2024)

Ask a question about Kentwood law

Corpus searches the Kentwood sections it holds and shows the ones that match, with their citations. Free, no sign-in.