§ 26-131 — Permits required
Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Code of Ordinances § 26-131
Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/80c7d32e-aca7-44f0-9029-4eda4917414b
Sec. 26-131. - Permits required.
A. Except as otherwise provided herein, no person, service provider, or row-user shall perform excavation or work, as those terms are defined in Section 26-101 hereof, in the right-of-way without a right-of-way permit. B. No adjoining property owner shall construct, maintain, or permit in or on the portion of the public right-of-way to which such land is adjacent, any fixed structure, material or object without having obtained the appropriate right-of-way permit and license if required by the encroachment policy. C. The application for a right-of-way permit shall be submitted to the City Engineer either by the registered ROW-user or an authorized agent of the ROW-user who will do the work and/or excavation in the right-of-way. If the ROW-user is performing work under a building permit issued by the City it may be used to satisfy this requirement provided the permit holder has agreed to be subject to Chapter 26 of the City Code for all work regardless of its nature in the right-of-way, all insurance and bonds as required hereunder are in force and approved and the ROW-user is identified as a subcontractor or contractor acting under such building permit and has a City business license. D. If the City Engineer determines that the applicant has satisfied the requirements of this article, the encroachment policy, this Code, and all applicable laws and regulations, the City Engineer shall issue a right-of-way permit. A right-of-way permit issued as a part of a building permit with all conditions of Subsection C of this Section met, such right-of-way permit shall be considered as being issued by the City Engineer provided the applicant has submitted himself/herself/itself to the conditions and requirements of Chapter 26 and there exists no reason that the City Engineer would not grant a separate right-of-way permit to such person or entity. E. Any person who is found to be working or excavating in the public right-of-way without a right-of-way permit will be directed to stop the excavation or work until a right-of-way permit is acquired and available at the excavation or work site. F. Except as otherwise provided herein, no person, service provider, or ROW-user shall narrow, close, alter, affect, or otherwise impact the normal flow of vehicular traffic or pedestrian traffic in the right-of-way without a temporary traffic control permit. G. The application for a temporary traffic control permit shall be submitted to the City Engineer either by the registered ROW-user or an authorized agent of the ROW-user who will do the temporary traffic control. H. If the City Engineer determines that the applicant has satisfied the requirements of this article, the encroachment policy, this Code, and all applicable laws and regulations, the City Engineer shall issue a temporary traffic control permit. I. Any person who is found narrowing, closing, altering, affecting or otherwise impacting the normal flow of vehicular traffic or pedestrian traffic in the right-of-way without a temporary traffic control permit will be directed to stop the cause for temporary traffic control, remove all temporary traffic control devices, restore normal traffic conditions and leave the site until a temporary traffic control permit is acquired and available at the site. J. No person shall place a temporary obstruction in the right-of-way except with the written consent of the City Engineer and such consent shall be subject to such terms and conditions as the City Engineer shall in his/her discretion determine necessary. K. Conditional use waivers and/or license agreements shall be obtained as required by the City's encroachment policy before a permit is issued. Conditional use waivers or license agreements, along with the attachments deemed necessary by the City Engineer, shall be submitted to the Public Works Department on the form provided by the City. The ROW user shall comply with all terms and conditions of the license agreement and procure the required insurance as directed by the City Attorney. Upon receipt of a completed application, the City Engineer will have ten (10) business days to: (a) return with comments, (b) deny, or (c) approve the conditional use waiver or license agreement. Following approval of an appropriate agreement, a ROW permit must be acquired, as applicable. before constructing, installing or maintaining authorized improvements within the licensed premises.
(Ord. No. 8347, § 1, 2-15-2018; Ord. No. 8855, § 1, 4-14-2020; Ord. No. 9249, § 1, 9-21-2021)
Ask a question about Lee's Summit law
Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.