Sec. 26-132. - Permit form.
A. The right-of-way permit application shall be on the form provided by the City Engineer and at a minimum shall include the following: 1. Compliance with all of the necessary registration requirements of this article, including: a. If the applicant is a person other than the registered ROW-user, proof that the applicant is an agent of the registered ROW-user, authorized to do the excavation or work in the permit request; or b. If the applicant is not performing excavation or work related to facilities in the right-of-way, proof that they are the adjoining property owner or an agent of the adjoining property owner, authorized to do the excavation or work in the permit request. 2. Attachments, including engineering drawings, construction plans, profiles, specifications, and as-builts, in the form maintained by the ROW-user, showing the location and area of the proposed project, that the structures or facilities planned to be used meet generally accepted engineering standards for support and soundness for the use intended including wind and ice loading, the location of all existing and proposed facilities at such location and certification that the proposed project complies with the design standards on file in the Office of the City Engineer; which documents shall be confidential and not disclosed to third parties to the extent permitted by law; 3. A temporary traffic control permit, if applicable; 4. An excavation or work plan including a schedule indicating the extent and duration of such plan, including a proposed start and end date; 5. All applicable right-of-way permit fees as provided in this article; 6. Payment of all money due to the City for right-of-way permit fees, for prior excavation or work costs, for any loss, damage or expense suffered by the City because of the applicant's prior excavation or work in the right-of-way or for any emergency actions taken by the City, unless the payment of such money is in dispute and timely appealed as provided hereafter; 7. Performance and maintenance bonds as provided in this article; and 8. Attachments, studies or other documents that establish to the City Engineer's satisfaction that use of the right-of-way will not interfere in any manner with the City's use of communication devices or with other users of the right-of-way for communication services. 9. Documentation that the applicant (or its proposed tenant) is authorized, and obtained all necessary government approvals, to provide service using the structure or excavation being proposed. B. The temporary traffic control permit application shall be on the form provided by the City Engineer and at a minimum shall include the following: 1. Compliance with all of the necessary registration requirements of this article, including, if the applicant is a person other than the registered ROW-user, proof that the applicant is an agent of the registered ROW-user authorized to do temporary traffic control; 2. Attachments, including engineering drawings, construction plans, traffic control plans, and specifications, in a form acceptable to the City, showing the location and area of the proposed project and the location of all existing and proposed traffic control at such location; 3. A right-of-way permit, if applicable; 4. A schedule indicating the extent and duration of such plan, including a proposed start and end date; 5. All applicable temporary traffic control permit fees as provided in this article; 6. Payment of all money due to the City for temporary traffic control permit fees, for prior temporary traffic control costs, for any loss, damage or expense suffered by the City because of the applicant's prior temporary traffic control in the right-of-way or for any emergency actions taken by the City, unless the payment of such money is in dispute and timely appealed as provided hereafter. C. The right-of-way permits issued under this article shall only be good for the area specified in the application and the permit itself. No work may take place outside the permit boundaries without a separate right-of-way permit.
(Ord. No. 8347, § 1, 2-15-2018)
Ask a question about Lee's Summit law
Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.