§ 26-134 — Permit conditions
Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Code of Ordinances § 26-134
Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/20a0b39e-ffda-4d41-ae0a-ff26ccbb8ab3
Sec. 26-134. - Permit conditions.
A. Right-of-way permit conditions include the following: 1. The City Engineer may impose reasonable conditions upon the issuance of a right-of-way permit and the performance of the ROW-user in order to protect the public health, safety and welfare, to ensure the structural integrity of the right-of-way, to protect the property and safety of other users of the right-of-way, and to minimize the disruption and inconvenience to the general public. Such permits shall be deemed to be subject to, and anyone obtaining such a permit shall be deemed to have consented to, the following conditions: a. Compliance with Missouri One Call statutes, regulations and policies; b. Compliance with the City's Code of Ordinances including its right-of-way ordinances, encroachment policy, and Unified Development Ordinance, zoning and subdivision regulations, all applicable laws and regulations, and any restrictions contained in any documents relating to the acquisition nor limit of use of the area the permit is being obtained for; c. Agreement to pay just compensation charged in an attachment agreement or to pay just compensation should the City charge for the use of its rights-of-way in the future; d. Agreement to indemnify and hold the City harmless from the ROW-user's use of the right-of-way which shall include defense and payment of money for attorneys' fees and all costs provided such condition provides that it is not to be deemed a waiver of sovereign or other immunities or defenses available to the City, its officials, employees and agents; e. Compliance with all design standards of the City and on file with the City Engineer; f. At all times any structure or facility used to support any ROW-user's equipment shall be structurally sound and not subject to failure for defects in design, maintenance, wear and tear, or weather conditions as identified by the City Engineer; and g. All notices may be provided to the address of record for the facility with the Public Service Commission, the Jackson County Assessor, the registered agent as shown at the Secretary of State of Missouri, or any entity granting the ROW-user permission to operate within the State of Missouri. 2. When a right-of-way permit is requested for purposes of installing additional facilities and the performance and maintenance bonds for additional facilities is reasonably determined to be insufficient, the posting of an additional or larger performance or maintenance bond for the additional facilities may be required by the City Engineer, except as otherwise provided in Division 10 hereof. 3. A ROW-user shall perform all excavation or work in full accord with any and all applicable engineering codes and design standards adopted or approved by the City and in accordance with applicable statutes of the State of Missouri, and the rules and regulations of the commission or any other local, state or federal agency having jurisdiction over the parties. A ROW-user shall perform all excavation or work in conformance with all applicable codes and established rules and regulations and shall be responsible for all excavation or work done in the right-of-way pursuant to its right-of-way permit, regardless of by whom the excavation or work is done. 4. Except in cases of an emergency or with approval of the City Engineer, no right-of-way excavation or work may be done in violation of a stop work order issued by the City Engineer if in his or her determination conditions are unreasonable for such excavation or work based on standard engineering and construction practices. 5. A ROW-user shall not disrupt a right-of-way such that the natural free and clear passage of water through the gutters or other waterways is interfered with. No person may park private vehicles within or next to the work or excavation area, except for such areas which may be designated and marked as safe areas for vehicle parking in accordance with an approved temporary traffic control permit. 6. If excavation or work is being done for the ROW-user by another person, a subcontractor or otherwise, the ROW-user shall be responsible for ensuring that the excavation or work of said person is performed consistent with its right-of-way permit and applicable law and shall be responsible for promptly correcting acts or omissions by said person. 7. The City Engineer may establish in the right-of-way permit limitations on the amount of excavation or work which may occur at one (1) time and the amount of right-of-way which may be obstructed during construction. 8. The ROW-user shall, in the performance of any excavation or work required for the installation, repair, maintenance, relocation and/or removal of any of its facilities, limit all excavation or work to that necessary for efficient operation. 9. The ROW-user shall not permit excavation or work to remain open longer than is necessary to complete the repair or installation, and in no event may excavation or work remain open beyond the expiration of the right-of-way permit or any approved extension. 10. The ROW-user shall perform excavation or work on the right-of-way at such times that will allow the least interference with the peace and quiet of the neighborhood, and shall not work between the hours of 10:00 p.m. and 7:00 a.m. 11. The City Engineer may limit the number of conduits that may be installed by each ROW-user based on the reasonable needs to ensure that no one ROW-user may unreasonably consume a disproportionate amount of the available right-of-way to deter competition. 12. All utility installations in excess of a total of two thousand five hundred (2,500) linear feet shall require a pre-construction meeting prior to commencement of any work on the right-of-way. 13. Street cut plates shall be placed in accordance with the City's specifications and shall not be in place for more than ten (10) calendar days without written approval of the City Engineer. 14. The City Engineer may allow street cuts on an individual review basis based on the criteria set out in this Chapter and the City's design standards. 15. All street cuts shall be restored in their entirety within ten (10) days of the street cut unless approved in writing by the City Engineer. Failure to complete within the ten (10) days shall constitute cause for the City to restore the cut and the permit holder shall reimburse the City its costs. 16. Any action or inaction by a permit holder that results in the City restoring or repairing of the right-of-way due to failure to comply with these or other conditions shall constitute cause for not issuing future permits and for the permit holder to be financially responsible to reimburse the City all of its costs whether from any bond held by the City or other means at the option of the City. B. Restrictions on poles, facilities, similar structures and certain equipment in the right-of-way in addition to design standards on file: When a pole, other facility or supporting equipment is not a part of a designed or constructed portion of an electrical, natural gas or communication distribution system made up of mostly wires, pipes and poles which serve the community and which are designed to be physically connected to each other, the following restrictions shall apply to pole and facility placement unless a different location is approved by the City Engineer upon a showing of the: (a) location being necessary to the provision of services, (b) that the ability to use the right-of-way by others including abutting landowners, utility users, the City, pedestrians and vehicles will not be impeded nor thwarted from the original purpose of the right-of-way, (c) compatibility with roadside design guidance, and (d) that the public and adjacent property safety may be maintained. 1. To the greatest extent possible a pole shall be located adjacent to what would be a side yard area of a property outside of any driveway or sight triangle or in the area of the front yard of any structure drawing parallel lines from the edges of the structure to the right-of-way line; 2. The placement of a pole or similar facility and supporting equipment may not occupy the entire available right-of-way area between the curb and edge of the sidewalk closest to the curb; 3. The pedestrian and vehicular paths may not be blocked, impeded or rendered out of compliance with any state, federal or local law dealing with pedestrian or vehicular passage or use such as, but not limited to, Americans with Disabilities Act, 42 U.S.C. Section 12101 et seq.; 4. A pole may not be placed closer to any structure on abutting property than its natural fall path in the event it structurally fails or is struck by a vehicle, but in no event less than a 1:1 ratio for single material/piece construction such as a wood pole; 5. A pole may not block the view of or from the primary structure on any lot, parcel or tract; 6. A pole may not be taller than ten (10) feet above: (i) the top of the tree canopy in the same city block where the pole is to be installed or (ii) a pole that is part of a distribution system within one (1) block of the proposed placement; 7. To demonstrate at any time reasonably requested by the City Engineer that the structure or facility being used to support any equipment or that is remaining in the right-of-way is structurally sound and does not present a threat to the public, other right-of-way users or abutting or adjoining property and land owner safety or to property that is lawfully in place in the immediate vicinity of the structure or facility; and 8. Security in a form acceptable to the City Attorney's Office shall be deposited with the City Finance Director for the purpose of ensuring that should a pole's placement, existence, code violation or structural failure cause harm or injury of any kind to a user of the right-of-way or abutting property, or property located in the right-of-way or other property not located in the right-of-way, that any damages or costs may be recovered. Such security may include but not be limited to an agreement for indemnification and hold harmless of the City and abutting landowner and a pledge of assets to support such agreement, a pledge of assets, a lien on property owned by the pole provider or user that may be enforced, sufficient assets of at least twenty-five million dollars ($25,000,000.00) that are not pledged to another, insurance renewable annually naming the City as an additional insured, and such insurer shall owe the City a duty of defense, a bond or similar document so that this security functions in the same manner as other security for operations and structure issues of similar development in the event of harm, failure or code violations. A violation of any of the restrictions set out in this subsection in the actual placement, or subsequent to placement, of the equipment, facility or pole may result in the permit for occupancy of or use of the right-of-way being revoked and the facility or pole ordered removed at applicant's sole cost by order of the City Engineer. All costs of the City in enforcing this article including but not limited to revocation shall be paid by applicant including attorney's fees upon written demand by the City Manager, to the name and address last on file at the City. If the applicant for the placement of, or any transferee of ownership interests in, the pole, equipment or facility does not agree with the decision of the City Engineer, such applicant may seek review or an appeal in the same manner as provided for in Division 9 of this article. C. Temporary traffic control permit conditions include the following: 1. The City Engineer may impose reasonable conditions upon the issuance of a temporary traffic control permit and the activities of the ROW-user in order to protect the public health, safety and welfare, to ensure the structural integrity of the right-of-way, to protect the property and safety of other users of the right-of-way, and to minimize the disruption and inconvenience to the traveling public. 2. A ROW-user shall comply with all laws, ordinances, codes, regulations and all applicable engineering codes adopted or approved by the City. A ROW-user shall be responsible for all traffic control in the right-of-way pursuant to its Temporary Traffic Control Permit, regardless of who performs the temporary traffic control. 3. The City Engineer may order the cessation of temporary traffic control approved by such permit if in the opinion of the City Engineer, based on standard engineering and construction practice, conditions are unreasonable for the continuation of such temporary traffic control. Except in cases of an emergency or with the approval of the City Engineer, there shall be no interruption of normal traffic in violation of a stop work order issued by the City Engineer. 4. No person may park private vehicles within or next to the temporary traffic control area, except for such areas which may be designated and marked as safe areas for vehicle parking in accordance with an approved plan and areas where parking is legally permitted under normal conditions. 5. If temporary traffic control is being done for the ROW-user by a third person, such as a subcontractor, the ROW-user shall be responsible for ensuring that the temporary traffic control of said third person is performed consistent with the temporary traffic control permit and applicable law and the permit holder shall be responsible for promptly correcting any wrongful or erroneous acts or omissions by said third person. 6. The City Engineer may establish in the temporary traffic control permit limitations the extent to which traffic may be impacted at any one (1) time. 7. The ROW-user shall limit all temporary traffic control to that which is approved through the permit. 8. The ROW-user shall not impact normal traffic flow longer than is necessary to complete the project, and in no event may the impact to traffic exceed the expiration of the temporary traffic control permit or any approved extension. 9. Non-emergency temporary traffic control on arterial and collector streets may not be performed before 9:00 a.m. and after 4:00 p.m. Monday thru Friday, nor anytime on Saturday, Sunday or public holidays observed by the City of Lee's Summit. The City Engineer may grant exception to this condition in the temporary traffic control permit. D. Terms and conditions for small wireless facilities. 1. The City of Lee's Summit's Standard Terms and Conditions for the Placement of Wireless Facilities in the Right-of-Way, and its most current edition, as approved by the City of Lee's Summit City Council is hereby adopted and incorporated in this chapter as fully as if set forth herein. 2. Three (3) copies of the City of Lee's Summit's Standard Terms and Conditions for the Placement of Wireless Facilities in the Right-of-Way and any amendments thereto are on file in the office of the City Clerk.
(Ord. No. 8347, § 1, 2-15-2018; Ord. No. 8528, § 2, 12-18-2018; Ord. No. 8855, § 1, 4-14-2020; Ord. No. 9249, § 1, 9-21-2021)
Ask a question about Lee's Summit law
Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.
