Sec. 3.410 - Site development permit—Application, content and submission requirements.
A. Application. Applications for a site development permit shall be submitted to the City to determine if the infrastructure in the proposed development complies with the design criteria in the DCM and shall contain the following: 1. Engineering plans, as required and described below. 2. Design reports, as required and described below. B. Engineering plan contents. Specific plan requirements are contained in the sections of the design criteria of the DCM for various types of infrastructure. Minimum general requirements include the following: 1. Cover sheet: a. Project title. b. Vicinity map. c. Developer's name, address, phone and fax number, and email address. d. Design Engineer's name, address, phone and fax number, and email address. e. List of drawings (including revision dates). f. Utility contact information. 2. Engineering plans: a. Title block. b. General notes. c. Survey control data. d. Summary of quantities. e. Existing utilities, easements, and right-of-way. f. Utility relocations. g. Typical sections for streets and their classifications, design and posted speed limits, current and future (20 year) ADTs (average daily traffic) for arterials, rights-of-way, sidewalks, driveways, pavements, slopes, and other features, as required. h. Plan views, profiles and details: (1) Street, curb, gutter, sidewalks and pavements. (2) Traffic signals and pavement markings. (3) Sidewalks and associated ADA ramp details. (4) Storm sewers. (5) Detention facilities. (6) Sanitary sewers. (7) Water lines. i. A temporary traffic control plan shall be in accordance with Section 3000 of the DCM and will be reviewed and approved by the City Traffic Engineer or their designee. j. Permanent signing and marking plan. k. Drainage area map, mass grading plan, and a master drainage plan for the entire development in accordance with the requirements in Section 5600 of the DCM. l. Erosion and sediment control plan for the entire development in accordance with the requirements in Sections 5100 and 2100 of the DCM. 3. All infrastructure shall have its own unique stationing and/or coordinates. 4. All drawings, except detail sheets, shall be drawn to an acceptable standard engineering scale and shall include a bar scale. 5. The City's standard details, necessary to complete the improvements, shall be incorporated into the plans. 6. Plans shall include at least two written benchmark descriptions and elevations, based on USGS (NAD83) or the City's datum. 7. Minimum font size on all plans shall be 0.125 inch on full size plans. 8. Appropriate line weights shall be used according to generally accepted drafting standards. 9. All plans should be oriented so that north is to the top (up) or to the left of the sheet and shall include a north arrow. 10. Legend shall be included showing line weights, symbols, abbreviations, etc. 11. Aerial backgrounds and imagery shall not be allowed, unless approved. 12. Oil and gas wells and undermined areas. a. Engineering plans for any proposed development shall show the surveyed location of any oil or gas well or undermined area within the development. b. Documentation of compliance with the Revised Statutes of Missouri, and the Code of State Regulations shall be provided with the engineering submittal for any oil or gas wells that are plugged and abandoned within the development. c. Monumentation of plugged and abandoned oil and gas wells. (1) The permanent markers shall be placed at all plugged and abandoned oil and gas wells located under pavement in compliance with this section and the Unified Development Ordinance. (2) The permanent marker shall be a "Mark-it" concrete/bench marker Model C/M-SS-3 1/4B (three and one-quarter-inch inch flat/dome top by three-inch split stem brass marker), with magnet, or an approved equal approved by MDNR. (3) The permanent marker shall be stamped with the identifying number for the well, as issued by MDNR. C. Design reports (as applicable). 1. Stormwater study (detention and/or retention system). a. General information and methodology used. b. Existing conditions analysis. c. Proposed conditions analysis. d. Future conditions analysis (if applicable). e. Conclusions and recommendations. f. Figures, maps and exhibits (as appropriate). g. Supporting calculations. 2. Sanitary sewer analysis. a. Sanitary sewer system calculations for a 50-year rainfall event including hydraulic grade line. b. Include all drainage areas upstream of the proposed site including future build-out upstream. c. Include all drainage areas downstream of the proposed site including future build-out downstream. Final point of analysis downstream of the site shall be determined following a consultation with City staff, based on an assessment of the downstream conditions. 3. Water system analysis. a. A physical test of specific fire hydrants and/or modeling of the system may be required to ensure adequate flows are available for the proposed development. b. An analysis of future development may be required to ensure the water main sizing is adequate to provide proposed and future water flows. 4. Traffic impact studies shall be as directed by the City Traffic Engineer and shall be performed by an engineer with specific experience and knowledge in traffic engineering. 5. Soil or geotechnical reports, if applicable to the design of any element of the proposed improvements, shall be performed by an engineer with specific experience and knowledge of soil testing and geotechnical engineering. 6. Alternate pavement designs: If an alternate pavement design is proposed by the design professional, the following shall apply: a. The City shall provide specific design parameters for inclusion in the calculations. b. The City shall require soil testing and subsequent geotechnical reports which demonstrate the alternate pavement design is at least as adequate as the standard design. c. The City shall require collection of soil samples at locations and frequency which are appropriate for the area. D. Submissions. 1. Two sets of sealed engineering drawings on 24-inch by 36-inch paper and one digital file in multi-page pdf format for the initial submittal. Three full-size and one digital file in multi-page pdf format for final distribution of the approved plans. One set to be stamped and returned to the contractor upon approval and payment of fees. 2. One copy of each of the following, as applicable: a. Design reports, as required. b. SWPPP for project sites greater than one acre. c. Engineer's opinion of probable construction costs (EOPCC). This shall be an itemized list by quantity to include all materials, labor, and equipment necessary to complete the entire project and shall be submitted as a separate document. The EOPCC shall include, but not be limited to the following items: (1) Public infrastructure: (a) Sidewalks, streets, pavements, street signage and lighting, traffic signals, sanitary system, storm water system, and water system. (b) Grading/excavation work. (c) Offsite public improvements. (d) Erosion and sediment control devices and final site restoration activities. (e) Detention/retention facilities. (f) Traffic control. (g) All other work required to complete the project. (2) Private infrastructure: (a) Water service line larger than two inches in diameter, valves, hydrants, and backflow preventer with vault, if outside the building. (b) Storm water piping six inches and larger, structures, and detention/retention facilities. (c) Detention/retention basins. (d) Erosion and sediment control devices and final site restoration activities. (e) Private street construction, including parking lots, drive approaches and sidewalks. (f) Site grading/excavation. (g) Retaining wall structures designed to facilitate site grading. (h) Private sanitary sewer laterals, wyes, cleanouts, and connection of the building stub to the public main. (i) Traffic control devices. d. All applicable local, state, federal and private agency permits. 3. Separate (proposed) off-site easement documents as required for easements not dedicated on a plat. 4. An ArcGIS compatible point shapefile adjusted to the State Plane "Grid" Coordinate System (NAD 1983 Missouri West FIPS 2403 feet) depicting: a. The center of each sewer manhole structure. b. The termination of each sanitary sewer service. c. The location of each water main valve. d. The location of each water main fitting (bend, tee, etc.). Site development permit applications, contents and submissions that are inactive for a period of one year from the date of last correspondence from the City will expire. They may be granted an extension up to one year, at the discretion of the Director, based upon consideration of the following criteria: A. Significant changes to the design specifications or other City codes. B. Changes to the engineering plan review and inspection (EPRI) fee.
(Ord. No. 8895, § 1, 6-9-2020)