Sec. 3.475 - Site development permit—Substantial completion and final acceptance.
A. Substantial completion. A certificate of substantial completion will be issued upon satisfactory completion of the improvements to a point where they can be used for their intended purposes. At that time, a punch list of items remaining to be completed prior to final acceptance will be provided to the contractor/developer. Items to be completed prior to issuance of a certificate of substantial completion shall include, but not limited to, the following: 1. An acceptable as-graded master drainage plan (including detention basin). 2. All required letters of authorization from MDNR. 3. Completion of all required testing of constructed improvements, including, but not limited to, water line bacteriological tests, hydrostatic tests, backflow valve tests, vacuum tests, mandrel tests, infiltration/exfiltration tests, tone test for tracer wire, etc. 4. Completion of video inspection by the City or approved subcontractor. 5. Any conditions required in a development agreement or letter of credit. 6. Proper vegetation or stabilization of all disturbed areas. 7. All street and traffic control signage. B. Punch list. The contractor/developer has 30 days from the issuance of the certificate of substantial completion to complete all punch list work (i.e. gutter buddy removal, proper vegetation or erosion control measures, minor infrastructure repairs, etc.) on the project and submit the following items to the Director: 1. Maintenance security. a. A suitable maintenance bond, cash deposit, certified check, or other acceptable form of maintenance security for 50 percent of the total construction cost, for a period of three years after substantial completion, shall be furnished to the City guaranteeing the materials and installation/workmanship of the construction involved in the public improvement project. b. The maintenance bond, or other form of maintenance security, shall be for all public streets (including subgrade), storm sewers, sanitary sewers, water lines, sidewalks, street signs, traffic signals and all other public infrastructure. c. If more than one contractor performs work on any infrastructure item, a separate bond must be provided by each contractor for their portion of the work. d. The warranty period for all bonds will begin at the time of issuance of the certificate of substantial completion by the City for all improvements. e. No project shall be accepted by the City prior to the submittal and acceptance of the maintenance bond(s) by the Director. 2. An executed final affidavit and agreement. 3. Record drawings, electronic files. 4. Compensation for inspector overtime, when applicable. 5. A copy of the engineer's as-built survey notes and the engineer's inspection record notes, if requested by the City. 6. A suitable performance bond for restoration and revegetation in accordance with the adopted policy for acceptance of revegetation performance bonds, if such restoration and revegetation items are not expected to be completed at final acceptance. In the event all work is not complete and all items submitted within 30 days, additional building permits may not be issued and inspections on any building permits issued for any building within the property described on the certificate of substantial completion may be suspended at the discretion of the City. C. Final acceptance. A certificate of final acceptance for the project will be issued when all requirements are fully met. A certificate of final acceptance must be obtained prior to issuance of a certificate of occupancy for any building within the property described on the certificate of substantial completion. A temporary certificate of occupancy may be issued prior to final acceptance, at the discretion of the City, provided a certificate of substantial completion has been issued. A performance bond for restoration and revegetation may be accepted at final acceptance in lieu of final completion of such restoration and revegetation, in accordance with the adopted policy for acceptance of revegetation performance bonds. D. Warranty period. The City will re-inspect the public improvements prior to the expiration of the warranty period. Any defects noted as a result of this re-inspection shall be corrected within a time period specified by the City at the contractor/developer's expense upon written notification by the City. A written copy of the final inspection report will be forwarded to the contractor/developer.
(Ord. No. 8895, § 1, 6-9-2020)