§ 3.470 — Site development permit—Record drawings
Code of Ordinances of the City of Lee's Summit, Missouri (Codified through Ordinance No. 10423, enacted July 14, 2026 (Supp. No. 56)) · Lee's Summit Unified Development Ordinance § 3.470
Corpus is an independent public-information project, not the official City of Lee's Summit website. Stable reference: corpuslaw.us/code/3165b85c-7ce8-4567-89a9-7243bda589e6
Sec. 3.470 - Site development permit—Record drawings.
A. Record drawings, including "as-graded" plans, must include results of a post construction survey and shall be accepted by the City. The post construction survey date shall not precede the issuance of any partial acceptance of work and shall include the following: 1. Final street grades at intervals determined by the design engineer and approved by the City. 2. Final elevations of all sanitary and storm sewer lines and structures including pipe inverts and structure top elevations including hydraulic grade line revisions and calculations, if requested by the City. 3. Final adjusted stationing and/or coordinates of all streets, sanitary and storm sewer structures, service line connections, and water line valves and hydrants. 4. As-graded contours as shown on the grading and drainage plans (master drainage plan) including as-graded contours of any detention basin and elevations of all associated stormwater structures and associated appurtenances (including as-built storage volumes of the basin). 5. Actual materials used. 6. Record drawings shall not include any future improvements. B. All easements or right-of-way revised during construction must be noted on the record plans and recorded easement documents must be submitted. C. Electronic files of record drawings must be received by the City before final acceptance of any public improvement project. D. Submittals shall consist of one full set of all project record drawings on 24-inch by 36-inch paper and one digital file in multi-page pdf format. E. Record drawings must include a signed engineer's certification stating that the drawings conform to construction records and post construction survey information and shall be dated and stamped "Record Drawing." F. An ArcGIS compatible point shape file adjusted to the State Plane "Grid" Coordinate System (NAD 1983 Missouri West FIPS 2403 feet) depicting: 1. The center of each sewer manhole structure. 2. The termination of each sanitary sewer service. 3. The location of each water main valve. 4. The location of each water main fitting (bend, tee, etc.).
(Ord. No. 8895, § 1, 6-9-2020)
Ask a question about Lee's Summit law
Corpus searches the Lee's Summit sections it holds and shows the ones that match, with their citations. Free, no sign-in.
