Section 400.261: Lot And Street Development Standards.
A. The following standards are regarded as requirements for desirable development. The size, shape and orientation of lots shall be designed to provide desirable building sites and logically related to topography, natural features, streets, and adjacent land uses. Due regard shall be given to natural features such as large trees; unusual rock formations; watercourses; and sites which have historical significance, scenic views, and similar assets, the preservation of which would add attractiveness and value to the subdivision. The following minimum standards are set forth as guides to these goals. 1. When additional right-of-way is dedicated on existing streets for future widening, calculations of the area of a lot should not include the dedicated strips in determining the gross area of the lot. Right-of-way dedication shall be required for all proposed developments which front along a public road. The area of all lots must be calculated exclusive of the street rights-of-way. 2. Improvement Of Existing Streets. Any development fronting on an existing road or street shall be responsible to bring the road or street up to City specifications to the centerline of the road or street. The City's Thoroughfare Plan shall be a guide in determining which roads need improvement. Streets going through a development shall have the guidelines set forth above applied to both sides of the street. It is the developer's responsibility to make infrastructure improvements necessitated by the proposed project that are reasonably related to the proposed activity. In cases where there is a proportional impact to the area, the developer shall be responsible for the proportional costs according to the percent the proposed activity contributes to the need for improvements to the infrastructure in the area. The approved traffic study will determine the infrastructure improvements that will be necessary. 3. Where there is a question as to the suitability of a lot or lots for their intended use due to factors such as rock formations, soil conditions, steepness of terrain, flood conditions, or other adverse natural physical conditions, the Commission may, after adequate investigation, withhold approval of such lots until engineering studies are presented to the Commission which establish that the method proposed to meet any such condition is adequate to avoid significant danger to health, life or property.
[ Ord. No. 7042 , 8-24-2023 ]
Ask a question about O'Fallon law
Corpus searches the O'Fallon sections it holds and shows the ones that match, with their citations. Free, no sign-in.