For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 98-32 — Excavation permit—Issuance

Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., City Code § 98-32

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/443dac2c-c0dc-44ef-9169-55fa399a2e94

Sec. 98-32. - Excavation permit—Issuance.

(a) A right-of-way user who requests the issuance of an excavation permit under this article shall file an application with the director. Said application shall be submitted on forms approved by the director. The application shall include, at minimum, the following: (1) Compliance with all of the necessary registration requirements of this article to enable the director to reasonably determine compliance with this article, including: a. If the applicant is a person other than a registered public utility, proof that the applicant is an agent of the registered public utility authorized to perform the work, or b. Proof that the applicant is the adjoining property owner or authorized to perform the work on behalf of the adjoining property owner. (2) Construction and engineering drawings, plans, profiles, specifications, and as-builts in the form maintained by the right-of-way user showing the location and area of the proposed project and complying with the requirements of section 98-47. (3) A temporary traffic control plan or certification that the work will not impact normal traffic patterns. At the discretion of the director, a temporary traffic control plan may be required where it appears reasonably probable the proposed work could impact normal traffic patterns. (4) Any additional information requested by the director from the applicant which will aid the director in determining compliance with the provisions of this article. (b) After receiving an application for an excavation permit, the director shall review the application for compliance with this article. (c) The director is authorized to issue excavation permits subject to the terms of this article and upon the director's determination that: (1) The excavation or facility complies with all other applicable City Code provisions, including but not limited to applicable zoning or subdivision provisions; (2) The excavation or facility complies with all design standards of the city on file with the city clerk; (3) The excavation or facility will not obstruct the legal use of the right-of-way by the city and other authorized right-of-way users; (4) The excavation or facility does not interfere with the safe operation of traffic control equipment or any other city-owned equipment within the right-of-way; (5) The excavation or facility does not materially interfere with or obstruct sight lines or clear zones for the traveling public; (6) The excavation or facility does not interfere with the city's compliance with the Americans with Disabilities Act or similar federal or state standards; (7) The facility is to be installed and maintained so as not to obstruct or hinder travel on the right-of-way; (8) The facility is to be installed and maintained in a manner that does not create an unsafe condition within the right-of-way; and (9) The facility complies with nationally recognized and reasonable engineering standards applicable to such facilities. (d) Approval of an application for an excavation permit under this article authorizes the applicant to undertake the excavation or deployment, construction, reconstruction, maintenance or repair of the facility or facilities identified in the excavation permit.

(G.O. No. 6966, § 1(Exh. A), 12-15-2025)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.