For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 98-40 — Permit fees

Code of the City of Springfield, Missouri (Supp. No. 23, Update 2: codified through G.O. No. 6973, enacted January 12, 2026) · Springfield, Mo., City Code § 98-40

Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/2f28390b-5c1d-40a9-9cf9-c23056c5726f

Sec. 98-40. - Permit fees.

(a) The director is hereby authorized and empowered to charge fees for the issuance of right-of-way work, temporary traffic control, and excavation permits. It shall be the duty of the director to account monthly to the director of finance for all such fees and for all payments made to him for work completed within a right-of-way. (b) Application fees shall be: (1) Based on the actual, direct, and reasonable costs incurred by the city for the review, processing, and approval of an application for the applicable permit; (2) Based on an allocation among all users of the right-of-way, including the city, which shall reflect the proportionate costs imposed on the city by each of the various types of uses of the right-of-way; (3) Imposed on a competitively neutral and nondiscriminatory basis; (4) Imposed in a manner so that aboveground uses of the right-of-way do not bear costs incurred by the city to regulate underground uses of the right-of-way; and (5) Shall not be offset or construed to replace any business license or other tax the right-of-way user is subject to under state or local law. (c) In determining the actual, direct, and reasonable costs reasonably incurred by the city in managing the right-of-way, the director may include any costs associated with the following: (1) The cost of issuing, processing and verifying right-of-way permit and temporary traffic control permit applications; (2) The cost of inspecting job sites, traffic control installations and conditions, and restoration projects; (3) The cost of protecting or moving right-of-way user construction equipment and materials after reasonable notification to the right-of-way user; (4) The cost of determining the adequacy of public right-of-way restoration; (5) The cost of restoring temporary traffic control, excavation or work inadequately performed after providing notice and the opportunity to correct the temporary traffic control, excavation or work, including re-inspection fees; or (6) The cost of revoking permits. (d) The right-of-way permit fee shall be imposed based on a per city block basis, but not to exceed continuous linear work of more than 660 feet in length. (e) The traffic control permit fee shall be imposed based on a per city block, but not to exceed 660 feet in length, per week basis or per intersection per week basis, whichever is greater. (f) The excavation permit fee shall be imposed based on a per city block basis, but not to exceed continuous linear work of more than 660 feet in length. (g) In the event the scope of a project is revised during the course of the work, the director may recalculate the fee based on the actual size of the excavation or work, and may require an additional right-of-way permit fee. (h) In the event the scope of the project changes such that a traffic control plan is revised, the director may recalculate the fee based on the actual impact, and may require an additional traffic control permit fee but in no event shall the city grant credits or refunds based on an overpayment of the permit fee. (i) The director may establish a system providing for payment of permit fees by right-of-way users in bulk. (j) Notwithstanding the provisions of this section, the total fee for an application for the collocation of small wireless facilities to an existing city facility shall not exceed $100.00 per small wireless facility. (k) Notwithstanding the provisions of this section, the total fee for an application for the installation, modification, or replacement of a utility pole and the collocation of an associated small wireless facility shall not exceed $500.00 per pole. (l) The director shall charge a collocation fee for any small wireless facilities collocated on city-owned facilities or city-owned wireless support structures. Such fee shall not exceed $50.00 per city pole per year.

(G.O. No. 6966, § 1(Exh. A), 12-15-2025)

Ask a question about Springfield law

Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.