§ 29-187 — Permit application and issuance
Code of Ordinances of the City of St. Joseph, Missouri (Codified through Ordinance No. 3140, enacted February 2, 2026. (Supp. No. 8)) · St. Joseph Code of Ordinances § 29-187
Corpus is an independent public-information project, not the official City of St. Joseph website. Stable reference: corpuslaw.us/code/9587c5d8-c874-486f-a69b-b1d54b5e7129
Sec. 29-187. - Permit application and issuance.
(a) The user required to obtain a wastewater discharge permit shall complete and file, with the city, an application in the form prescribed by the city. Existing users required to obtain a wastewater discharge permit shall submit a complete application for the permit to the director within 30 calendar days after the effective date of this division. Existing users with proposed expansion, addition of new product line or change in process shall apply for a new wastewater discharge permit at the same time a building permit is requested. All new users shall apply for a wastewater discharge permit at the same time a building permit is requested. In support of the application, the user shall submit, in units and terms appropriate for evaluation, the following information: (1) Name, address and location, if different from the address. (2) SIC number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1987, as amended. (3) Wastewater constituents and characteristics, including but not limited to those mentioned in subdivision II of this division as determined by a reliable analytical laboratory. Sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Act and contained in 40 CFR 136. (4) Time and duration of contribution. (5) Average daily and 15-minute peak wastewater flow rates, including daily, monthly and seasonal variations if any. (6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections and appurtenances by the size, location and elevation. (7) Description of activities, facilities and plant processes on the premises, including all materials which are or could be discharged. (8) Where known, the nature and concentration of any pollutants in the discharge which are limited by the city or state or federal pretreatment standards and a statement regarding whether or not the pretreatment standards are being met on a consistent basis and, if not, whether alternative manufacturing, processing, housekeeping procedures, operation and maintenance, or additional pretreatment is required for the user to meet applicable pretreatment standards. (9) If additional pretreatment or additional or alternative manufacturing, processing, housekeeping procedures or operation and maintenance procedures will be required to meet pretreatment standards, the user will provide the shortest schedule for compliance. The completion date in this schedule must be approved by the director and shall not be later than the compliance date established by any applicable national categorical pretreatment standard. The conditions contained in Section 29-193 shall apply to this schedule. (10) Each product produced by type, amount, process and rate of production. (11) Type and amount of raw materials processed (average and maximum per day). (12) Number and type of employees and hours of operation of the plant and proposed or actual hours of operation of the pretreatment system. (13) Any other information as may be deemed by the city to be necessary to evaluate the permit application. (b) The director will evaluate the data furnished by the user and may require additional information. Within 45 calendar days of receipt of a complete wastewater discharge permit application, the director will determine whether or not to issue a wastewater discharge permit. The director may deny any application for a wastewater discharge permit. (c) Each user must notify the director of any planned significant changes to the user's operations or system which might alter the nature, quality or volume of its wastewater at least 30 calendar days before the change. All significant industrial users, as defined herein, shall notify the director immediately of any changes at its facility affecting the potential for slug discharge. The director may require the user to submit such information as may be deemed necessary to evaluate the change condition, including the submission of a wastewater discharge permit application as specified in this subsection. For purposes of this requirement, significant changes include, but are not limited to, flow increases of 20 percent or greater and the discharge or any previously unreported pollutants. (d) Wastewater discharge permit contents. A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the director to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal and protect against damage to the POTW. (1) Wastewater discharge permits must contain: a. A statement that indicates wastewater discharge permit duration, which in no event shall exceed more than five years. b. A statement that the wastewater discharge permit is nontransferable without prior notification to the city in accordance with Section 29-191 of this article, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit. c. Effluent limits, including best management practices, based on applicable pretreatment standards. d. Self-monitoring sampling, reporting, notification and record keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency and sample type based on federal, state and local law. e. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state or local law. f. Requirement for prior notification to the city by any industrial user connected to the POTW of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system. g. Requirement of any industrial user to control slug discharge, if determined by the director to be necessary. (2) Wastewater discharge permits may contain, but need not be limited to, the following conditions: a. Limits on the average and/or maximum rate of discharge, time of discharge and/or requirements for flow regulation and equalization. b. Requirements for the installation of pretreatment technology, pollution control or construction of appropriate containment devices designed to reduce, eliminate or prevent the introduction of pollutants into the POTW. c. Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated or nonroutine discharges. d. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW. e. The unit charge, limitation variance charge or a schedule of user charges and fees for the management of the wastewater discharged to the POTW. f. Requirements for installation and maintenance of inspection and sampling facilities and equipment. g. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit. h. Other conditions as deemed appropriate by the director to ensure compliance with this article and state and federal laws, rules and regulations. (3) The director may require, as deemed necessary, an industrial user to install continuous pH monitoring devices or other monitoring devices; if required, this will be included in the wastewater discharge permits. (e) Wastewater discharge permit appeals. Any person, including the user, may petition the director to reconsider the terms of a wastewater discharge permit within 15 working days of notice of its issuance. (1) Failure to submit a timely petition for review shall be deemed a waiver of the administrative appeal. (2) In its petition, the appealing party must indicate the wastewater discharge permit provisions objected to, the reasons for this objection and the alternative condition, if any, it seeks to place in the wastewater discharge permit. (3) The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal. (4) The director shall respond within 15 working days of all wastewater permit appeals. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit or not to modify a wastewater discharge permit shall be considered final administrative actions for purposes of judicial review. (5) Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision must do so by filing a complaint with the circuit court of Buchanan County, Missouri. (f) Wastewater discharge permit modification. The director may modify a wastewater discharge permit for good cause, including, but not limited to, the following reasons: (1) To incorporate any new or revised federal, state or local pretreatment standards or requirements; (2) To address significant alterations or additions to the user's operation, processes or wastewater volume or character since the time of wastewater discharge permit issuance; (3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge; (4) Information indicating that the permitted discharge poses a threat to the POTW, city personnel or the receiving waters; (5) Violation of any terms or conditions of the wastewater discharge permit; (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; (7) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; (8) To correct typographical or other errors in the wastewater discharge permit; or (9) To reflect a transfer of the facility ownership or operation to a new owner or operator. (g) Wastewater discharge permit revocation. The director may revoke a wastewater discharge permit for good cause, including, but not limited to, the following reasons: (1) Failure to notify the director of significant changes to the wastewater before the changed discharge; (2) Misrepresentation or failure to fully disclose all relevant facts in the wastewater permit application; (3) Falsifying self-monitoring reports; (4) Tampering with monitoring equipment; (5) Refusing to allow the director timely access to the facility premises and records; (6) Failure to meet effluent limitations; (7) Failure to pay fines; (8) Failure to pay sewer charges; (9) Failure to meet compliance schedules; (10) Failure to complete a wastewater survey or the wastewater discharge permit application; (11) Failure to provide advance notice of the transfer of business ownership of a permitted facility; (12) Violation of any pretreatment standard or requirement, any terms of the wastewater discharge permit or this article; (13) Failure to provide prior notification to the director of changed conditions. (h) Denial for outstanding fees and penalties. A wastewater discharge permit application may be denied to any user who has failed to pay any outstanding fees, fines or penalties incurred as a result of any provision of this ordinance, a previous individual wastewater discharge permit, or an order issued hereunder. (i) Any permit titled or described as a wastewater contribution permit, significant industrial user permit or other permit issued substantially in compliance with the requirements of this section prior to March 4, 2014 shall be deemed to be a wastewater discharge permit. Wastewater discharge permits shall be voidable upon cessation of operation or transfer of business ownership. All wastewater discharge permits issued to a particular user are void upon the issuance of a new wastewater discharge permit to that user.
(Gen. Ord. No. 1007, § 1(23-78(b)(2), (5)), 8-17-92; G.O. 1742, 1-10-00; G.O. 2407, 10-18-10; G.O. 2720, 3-3-14; G.O. 2735, 6-23-14)
Ask a question about St. Joseph law
Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.
