For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-189 — Limitation variance procedure

Code of Ordinances of the City of St. Joseph, Missouri (Codified through Ordinance No. 3140, enacted February 2, 2026. (Supp. No. 8)) · St. Joseph Code of Ordinances § 29-189

Corpus is an independent public-information project, not the official City of St. Joseph website. Stable reference: corpuslaw.us/code/e5ea2659-64bc-413e-8e11-8ac30326d0cd

Sec. 29-189. - Limitation variance procedure.

(a) Generally. No user of the city's treatment works shall discharge prohibitive pollutants in excess of the limitations set forth in Sections 29-156 and 29-157, unless the user has a limitation variance issued by the director. Existing users shall apply for a limitation variance within 30 calendar days after the effective date of this division. (b) Step 1. The user's application for a limitation variance hearing must accompany the application for a wastewater discharge permit and must have a notarized signature of an authorized representative of the user. In addition to the information required in support of the wastewater discharge permit application, the following information must accompany the application for a limitation variance: (1) General overall description of the user's efforts to meet the prohibitive standards set forth in this division. (2) Specific reasons why the user should be allowed to discharge pollutants in excess of the limits set forth in this division. (3) General overall process and manufacturing description. (c) Step 2. Within ten working days of receiving the application for limitation variance, the director will notify the user of a hearing date. (d) Step 3. All data for the director's review and consideration must be submitted ten working days prior to the hearing and must include: (1) Data which supports the request for a limitation variance. (2) A clear and concise statement which specifically states how the data supports the user's request for limitation variance. (e) Step 4. The city may recover reasonable costs and expenses as a result of the evaluation of the limitation variance request and limitation variance hearing. These costs and expenses may include but are not limited to laboratory testing costs and engineering services. The user shall verbally present the information which supports the limitation variance to the director at the hearing. (f) Step 5. (1) The director shall notify the user of his preliminary findings and decisions within 20 working days of the limitation variance hearing. The director shall base his preliminary decision and subsequent final decision on the user's limitation variance request on the following considerations: a. The effects the discharge of the specific pollutants, for which a variance is being requested, will have on the operation of the POTW or on the disposal of sludge. b. The removal capabilities of the city's POTW and evaluation if the pollutant will pass through the treatment works untreated into receiving streams. c. The city's capability to recycle and reclaim wastewater and sludges resulting from wastewater treatment. d. Any state or federal discharge requirement for the specific pollutant. e. Health and safety considerations of city workers at the POTW treatment works, pumping stations or collection stations. f. The capability of the city's POTW to meet NPDES permit discharge requirements. (2) The director may: a. Deny the request for a limitation variance. b. Approve the request for a limitation variance. c. Conditionally approve the request for a limitation variance. Conditional approval of a limitation variance request may be issued by the director for a specific time period. The director may establish a specific concentration of pollutant the user may discharge and may establish a limitation variance charge for the conditional approval of discharge of pollutants. The limitations variance charge the user is assessed shall be based upon: 1. Recovery of additional operation and maintenance costs incurred by the city's POTW as a result of the user limitation variance. 2. Recovery of any damage to pumps, laboratory equipment, computers or any other equipment at the POTW treatment works, pump stations or collection systems. 3. Additional equipment or manpower necessary for or associated with treatment of the pollutants allowed under the limitation variance. The limitation variance charge shall be adjusted periodically by the director to allow for the recovery of costs described in this subsection. (g) Step 6. Within ten working days of notification of the director's preliminary findings and decisions, the user must submit any additional data the user feels the director should evaluate for his final decision. The information must contain a clear and concise statement which specifically states how the data supports the users request for a limitation variance. (h) Step 7. The director will notify the user of the final decision on the limitation variance request. This notification shall include a written summary of the director's evaluation of the limitation variance request. (i) Step 8. Within 30 calendar days of the final notification from the director, the user must submit and have approved a compliance schedule to meet the pretreatment standards or cease contributing to the POTW. The compliance schedule shall conform to Section 29-193. (j) Step 9. After approval of the compliance schedule, the director shall issue a wastewater discharge permit.

(Gen. Ord. No. 1007, § 1(23-78(b)(3)), 8-17-92; G.O. 1742, 1-10-00; G.O. 2720, 3-3-14)

Ask a question about St. Joseph law

Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.