Sec. 29-361. - Construction.

(a) Before the start date of any excavation, each right-of-way user who has facilities located in the area to be excavated shall be responsible to mark the horizontal and approximate vertical placement of all its facilities in accordance with Missouri One Call System. A right-of-way user shall be solely liable for any damages caused by its mismarks. Any right-of-way user whose facilities are less than 20 inches below a concrete or asphalt surface shall notify and work closely with the person performing excavation in an effort to establish the exact location of its facilities and the best procedure for excavation. (b) Before the commencement of any excavation, the right-of-way user shall provide the director of public works and transportation 48 hours written notice before commencing any such work. (c) Before the commencement of any excavation, the right-of-way user shall provide each affected occupant of premises adjacent to the project 48 hours written notice before commencing any such work. The notification required herein may be satisfied through the use of door hangers or similar means. (d) The right-of-way user shall provide the public works and transportation director 72 hours prior written notice before the closure of any roadway, highway or street or interruption in traffic flow. (e) All work permitted by the permit shall be in accordance with the terms of the permit, and all applicable law and the code. All restoration work required shall be completed in accordance with the approved plans and specifications, the terms of the permit and all applicable law and the code, including, but not limited to, rules and regulations adopted by the public works and transportation director pursuant to Chapter 25, Article II, Division III of the code. (f) All work allowed under the permit shall be completed by the time required in the right-of-way permit.

(G.O. 1932, 4-28-03; G.O. 2111, 6-20-05; G.O. 2892, 12-17-18)