For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29-374 — Permit fees for work in the right-of-way

Code of Ordinances of the City of St. Joseph, Missouri (Codified through Ordinance No. 3140, enacted February 2, 2026. (Supp. No. 8)) · St. Joseph Code of Ordinances § 29-374

Corpus is an independent public-information project, not the official City of St. Joseph website. Stable reference: corpuslaw.us/code/74552fa3-7fbe-4df2-9bf3-75d9c4830103

Sec. 29-374. - Permit fees for work in the right-of-way.

(a) Each applicant shall pay to the city a right-of-way permit fee for each application for a right-of-way permit as follows: (1) Utility permits (for areas less than 300 lineal feet): a. For excavations of 100 square feet or less, a permit fee of $38.00, and a fee of $19.00 for each subsequent 100 square feet; and b. For horizontal direct drilling installations, a permit fee of $88.00 per project. (2) Right-of-way permits (for areas greater than 300 lineal feet), a permit fee of $50.00, plus $0.15 per foot of installed/repaired/rehabbed/maintained infrastructure. (3) Bulk permits, pursuant to administrative rules promulgated under the authority of Chapter 25 for issuance, a permit fee of $50.00. (4) Any fee required pursuant to this section shall be doubled for each activity requiring a permit under this section but not obtained, in violation of this section. Such right-of-way permit fee shall be based upon all of the city's costs in issuing, processing and verifying applications and inspections of the project site and restoration work up to two hours. Such right-of-way permit fee shall be paid by each applicant to the city at the time the applicant submits its application for a right-of-way permit. (b) Each right-of-way user shall pay to the city a supplemental right-of-way permit fee in the amount of all of the city's costs associated with the following: (1) Inspecting the project site and the restoration work in excess of two hours; and (2) Protecting or moving the right-of-way user's equipment or facilities after reasonable notification to the right-of-way user doing the right-of-way work; and (3) Determining the adequacy of right-of-way restoration; and (4) Inspecting and/or testing restoration work after rejection of improper or defective restoration work; and (5) Restoring work inadequately performed after the city has provided notice and five working days for the right-of-way user to correct such inadequate work; and (6) Revoking the right-of-way permit. (c) Fees paid for a right-of-way permit, which is subsequently revoked by the public works and transportation director, are not refundable. (d) In the event the scope of the project is revised during the course of the project, the public works and transportation director may reevaluate the fee based on the actual size of the excavation and may require an additional fee. (e) The amount of the right-of-way permit fee set forth in subsection 29-374(a) shall be reviewed annually by the public works and transportation director and adjusted based upon the costs to the city as set forth in subsection 29-374(a) as approved by the city council.

(G.O. 1932, 4-28-03; G.O. 1951, 6-9-03; G.O. 2111, 6-20-05; G.O. 2892, 12-17-18; G.O. 3053, 11-28-23)

Ask a question about St. Joseph law

Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.