Sec. 29-369. - Extensions of time and inspection.

(a) Any construction, excavation, or restoration work required under this article shall be completed in the time set forth in the right-of-way permit, unless extended. If a right-of-way user is unable to complete the construction, excavation or restoration work within the time set forth in the right-of-way permit due to reasons beyond the utility right-of-way user's control, upon application to the public works and transportation director, the time required for such work shall be extended to the extent of the delay caused by the reason beyond utility right-of-way user's control. Upon completion of such work, the right-of-way user shall immediately notify the public works and transportation director. The right-of-way user shall make the work site available to the public works and transportation director and to all others as authorized by law for inspection at any reasonable times during the execution and upon completion of the work. (b) At the time of inspection, the public works and transportation director may order the immediate cessation of any work which poses a serious threat to the public health, safety or welfare. (c) The public works and transportation director may order a right-of-way user to perform or redo any work which does not conform to this article, or other applicable standards, conditions or the code. An order issued pursuant to this section shall state that failure to correct the violation will be cause for revocation of the right-of-way permit. Within ten days after issuance of the order, the right-of-way user shall present proof to the public works and transportation director that the violations have been corrected. If such proof has not been presented within the required time, the public works and transportation director may revoke the right-of-way permit.

(G.O. 1932, 4-28-03; G.O. 2111, 6-20-05; G.O. 2892, 12-17-18)