For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-351 — Definitions

Code of Ordinances of the City of St. Joseph, Missouri (Codified through Ordinance No. 3140, enacted February 2, 2026. (Supp. No. 8)) · St. Joseph Code of Ordinances § 31-351

Corpus is an independent public-information project, not the official City of St. Joseph website. Stable reference: corpuslaw.us/code/7b533282-6f17-40d6-b0df-6ad62bdaff47

Sec. 31-351. - Definitions.

(a) As used in this article, the following terms shall have the meanings and usages indicated: AGL. Above ground level. Ground level shall be determined by the average elevation of the natural ground level within a radius of 50 feet from the center location of measurement. Accessory use. Any use authorized herein that exists in addition to the principal use of the property. Director. The director of planning and community development of the city or his/her designee. Exempt facilities: Exemption criteria for wind energy facilities: (a) Having a rotor arc of one meter (or 39.37 inches) or less in diameter, and other type of turbine having a rotation device with no dimension greater than 1 meter (or 39.37 inches), and (b) Mounted on an existing structure having a primary authorized use other than as a support structure for a wind energy facility, and (c) Having a setback from property lines at least 20 feet plus the principal building setback in addition to other setback requirements herein, and (d) With no portion more than ten feet above the highest part of the existing structure and no exposed moving part having less than 15 feet of clearance to the ground or other point of pedestrian access, and (e) No more than three exempt facilities may exist on any one parcel. FAA. The Federal Aviation Administration. FCC. The Federal Communications Commission. Height. For purposes of this article, the vertical distance measured from the average grade of the base of the structure above ground level to its highest point of any wind energy facility, which shall be calculated at the tip of the rotor blade at its highest point, or any higher portion of the structure that may exist. Large wind energy facilities. Wind energy facilities that are larger than 100 KW output, consist of a grouping of two or more non-exempt wind energy facilities, or otherwise do not meet the requirements for facilities authorized by permitted use or administrative approval. Modification. Any change to a structure requiring a building permit or other governmental approval. Net metering. Using metering equipment sufficient to measure the difference between the electrical energy supplied to a customer-generator by a retail electric supplier and the electrical energy supplied by the customer-generator to the retail electric supplier over the applicable billing period and as so defined pursuant to RSMo 386.290.2(5). Small wind energy facilities: Wind energy facilities, other than facilities authorized as a permitted use, having a capacity of 100 KW output or less and that fully comply with the general standards for wind energy facilities and satisfy all other requirements of this Code applicable to small wind energy facilities. Wind energy facilities or wind energy conversion systems (WECS): Facilities including turbines, support structures, accessory equipment and related components designed to create electrical or other energy by use of wind. Wind energy facilities include exempt facilities, small wind energy facilities, and other facilities, whether connected to the electrical grid of the local utility or independently operating.

(G.O. 2363, 11-30-09)

Ask a question about St. Joseph law

Corpus searches the St. Joseph sections it holds and shows the ones that match, with their citations. Free, no sign-in.