Sec. 31-353. - Administrative permit—Small wind energy facilities.
(a) The placement of small wind energy facilities shall be permitted by administrative permit approved by the director within any zoning district, subject to general standards and other requirements of this article and further limited as follows: (1) Application procedures. Applications for administrative permits shall be made on the appropriate forms to the director and accompanied by payment of the non-refundable fee as set out in subsection 31-075(2)(a) for a conditional use permit. a. Detailed structure plans and a detailed site plan, based on a closed boundary survey of the host parcel, shall be submitted clearly outlining all existing and proposed improvements including buildings, drives, walkways, parking areas and other structures, public right-of-way, the zoning categories of the subject and adjoining properties, the location of and distance to off-site residential structures, required setbacks, required buffer and landscape areas, hydrologic features, and the coordinates and height AGL of the existing or proposed tower. b. The application shall be reviewed by the director to determine compliance with the above standards, after which the application shall be transmitted for review and comment by other departments and public agencies that may be affected by the proposed facility. c. The director shall issue a decision on the permit within 45 days of the date of application or the application shall be deemed denied unless the application is referred to the planning commission as authorized by subsection 31-353(1)(d), or the time period for review and action is extended by written order of the director. The director may deny the application or approve the application as submitted or approve with such modifications as are, in his/her judgment, reasonably necessary to protect the safety or general welfare of the citizens, consistent with the purposes of this section. The director shall consider the purposes of this section and the factors established herein for granting a conditional use permit as well as any other considerations consistent with this article. A decision to approve, approve with modifications or disapprove an application shall be made in writing. If the decision is for approval with modifications or disapproval, the specific reasons for the modification or disapproval must be included. d. Minor variations: When an application does not fully comply with the requirements for administrative approval, but a minor variation to the requirements would, in the opinion of the director, be consistent with the spirit and intent of this Code, the director shall be authorized to refer the application to the planning commission, which shall be authorized to approve, disapprove or condition such variation as may be appropriate to meet the purposes of this Code, provided that the basis for the variation or disapproval is unique to the property or otherwise not typical to all applications. e. Appeals: Appeals from the decision of the director or the planning commission shall be made in the same manner as otherwise provided in Chapter 2, Article XIII of the code of ordinances for the appeal of administrative decisions. f. Requirements: No application for a small wind energy facility may be approved unless it fully complies with the requirements in this subsection and the general standards for wind energy facilities.
(G.O. 2363, 11-30-09)