§ 503 — BYPASS OF UPSTREAM FLOWS
Comprehensive Development Regulations for the City of Flowood; partial · Flowood Development Regulations § 503
Corpus is an independent public-information project, not the official City of Flowood website. Stable reference: corpuslaw.us/code/ccd94430-fcfb-426b-9bb6-ae857d34b6b6
SECTION 503 BYPASS OF UPSTREAM FLOWS
503.1 If it is desired by the developer of a piece of property to pass upstream flows through the property through means of a drainage way physically separated from the storm water management system of the development, this an acceptable practice.
503.2 The bypass drainage way must be designed to pass the 100-year 24-hour storm event without overtopping and without severe erosion problems.
503.3 The bypass drainage way must exit the property in the post-developed condition at the same location as the drainage from that upstream basin exited the property in the pre- developed state.
503.4 The bypass drainage way must have approximately the same flow exiting the property as it did entering the property or must be included in the calculations for the overall storm water management system for the development.